Planing of Konya wastewater treatment planr construction by CPM.

1991
Bodur , İIbrahim Volkan

Suggestions

Planing a quality system for high voltage testing laboratories
Çetin, Fatih; Arıkan, Yıldız; Department of Electrical and Electronics Engineering (1999)
Master plan for Ankara zoo and the planning of aquatic exhibition building.
Açıkkol, Cem; Department of Architecture (1984)
Optimisation of the Tigris river hydropower system operations
Yalçın, Emrah; Tiğrek, Şahnaz; Department of Civil Engineering (2015)
Growing external energy dependence and rising oil prices are encouraging Turkey to turn to renewable energy, especially hydropower. The amended legislation on the transference of the operational rights of existing, under-construction and planned hydropower plants to the private sector and the allocation of water right licenses to develop new projects for electricity production has led to a drastic decrease of the public share in production. Consequently, conflicts related to the operation of reservoirs have...
Planning criteria for interchanges.
Tanriverdi, Ela; Department of Civil Engineering (1992)
Assessment of sub-center development: Batikent, Ankara
Celep, Serhat; Günay, Baykan; Urban Design in City and Regional Planning Department (2009)
Sub-center formation is closely come out when urban environment started to grow and by decentralization and sub-urbanization process to lower the congestions and increase the efficiency in urban life. Besides, by means of rising problems of the growth in an urban area, there emerged the need to share the central activities within the metropolitan region. The growth followed by creation of new towns in the peripheries. Within that organization of the city, sub-centers started to appear to share the burden of...
Citation Formats
İ. V. Bodur, “Planing of Konya wastewater treatment planr construction by CPM.,” Middle East Technical University, 1991.