A Methodology for the Evaluation of Proposals Tendered on the Basis of Build-Operate-Transfer (BOT) Model

1996-09-13

Suggestions

A methodology for the evaluation of proposal tendered on the basis of buil-operate-tarnser model
Korkmaz, Ahmet; Birgönül, Talat; Department of Civil Engineering (1991)
A Model based guidance and vulnerability assessment approach for facilities under the threat of multi-hazard emergiencies
Ayhan, Murat; Ayhan, Murat; Birgönül, Mustafa Talat; Department of Civil Engineering (2012)
Disasters (e.g. earthquakes) and emergencies (e.g. fire) threaten the safety of occupants in the buildings and cause injuries and mortalities. These harmful effects are even more dangerous when secondary hazards (e.g. post-earthquake fires) emerge and it is commonly observed that the disasters/emergencies trigger secondary hazards.An effective indoor emergency guidance and navigation approach for occupants and first responders can decrease the number of injuries and mortalities during building emergencies b...
A heuristic procedure for single item, deterministic, periodic review, uncapacitated production/inventory models.
Sabuncuoğlu, Ihsan; Department of Industrial Engineering (1984)
A Methodology for Seismic Loss Estimation in Urban Regions Based on Ground-Motion Simulations
Ugurhan, Beliz; Askan Gündoğan, Ayşegül; Erberik, Murat Altuğ (2011-04-01)
Seismic vulnerability assessment of residential buildings in regions of high seismicity is an interdisciplinary problem requiring major inputs from fields of seismology and earthquake engineering. The basic two components of loss estimation methods are information on regional seismicity and building stock. This study presents a realistic loss estimation methodology where the first component, input ground motions, is obtained from regional ground-motion simulations using the stochastic finite-fault technique...
A methodology for determining the cluster of a new project
Yiğit, Aybeniz; Saatçioğlu, Ömer; Department of Industrial Engineering (2005)
By definition, all projects are unique; however R&D projects have specific characteristics that make them harder to manage. The project management methodology applied to R&D projects may show differences due to the categorization of them. But if there exists a categorization of projects, one can analyze the properties of the project classes and then manage similar projects similarly. In this study, the R&D projects of a main military electronics company of Turkey, are analyzed. Tunç (2004) has developed a m...
Citation Formats
M. T. Birgönül and İ. Dikmen Toker, “A Methodology for the Evaluation of Proposals Tendered on the Basis of Build-Operate-Transfer (BOT) Model,” 1996, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/75553.