A heuristic procedure for single item, deterministic, periodic review, uncapacitated production/inventory models.

1984
Sabuncuoğlu, Ihsan

Suggestions

A computer model for project scheduling under resourse constraints.
Issa, Hisham Ali; Department of Civil Engineering (1987)
A dissolved oxygen model for reservoirs and lakes with highly varying inputs and outputs
Mukhallalati, Labeeb; Soyupak, Selçuk; Department of Environmental Engineering (1994)
A heuristic procedure for a single-item dynamic lot sizing problem
Benli., Ömer S; Sabuncuoğlu, İhsan; Tüfekçi, Süleyman (Elsevier BV, 1988-1)
An O(T) heuristic proceudre for a single-item dynamic lot sizing problem is introduced in this paper. The algorithm tries to establish the regeneration points of the problem whether either the production or the beginning inventory must be equal to zero. The proposed algorithm is very easy to implement and compares very favourably with the existing heuristic procedures.
A process based model for measuring process quality attributes
Guceglioglu, AS; Demirörs, Onur (2005-01-01)
Organizations frequently use product based organizational performance models to measure the effects of information system (IS) on their organizations. This paper introduces a complementary process based approach that is founded on measuring business process quality attributes. These quality attributes are defined on the basis of ISO/IEC 9126 Software Product Quality Model. The new process quality attributes are applied in an experiment and results are discussed in the paper.
A design procedure for multivariable control systems and its applications.
Sezer, Erol M; Department of Electrical Engineering (1974)
Citation Formats
I. Sabuncuoğlu, “A heuristic procedure for single item, deterministic, periodic review, uncapacitated production/inventory models.,” Middle East Technical University, 1984.