Descriptive analysis of the inter-provincial migration:GAP Region 1975-80 and 1980-85

Download
1994
Arıkan, Beyhan

Suggestions

GAP: An Irrigation And Development Project In Turkey
Taraklı, Duran (Middle East Technical University, Faculty of Architecture, 1989)
The Southeastern Anatolia Project (GAP) in Turkey, which was initiated in 1976 with the Karakaya Dam consists of thirteen major projects. Twenty-two dams and seventeen hydroelectric power plants (HPP) with a total capacity of 7 561 MW will be constructed as part of it. GAP will provide irrigation for 1641282 hectares of land and will have an annual output of 25 003 GWh of power (1). Turkey has about 27.7 million hectares (ha) of land suitable for agriculture. Surveys show that it is economically feasible to...
Leisure constraints and negotiation strategies in tourism recreation: a comperative research with different cultures
Tek, Tolga; Koçak, Mehmet Settar; Department of Physical Education and Sports (2018)
The main problem of this study was to describe perceived constraints encountered and negotiation strategies utilized by foreign tourists in a recreational sport setting in different regions of Turkey. Moreover, discreteness in negotiation was examined according to gender, participation, the level and type of perceived constraint encountered. A questionnaire was conducted to a sample of randomly selected foreign tourists in different regions from Turkey. The modification study of Leisure Constraints Question...
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Tokdemir, Onur Behzat; Dikmen Toker, İrem (American Society of Civil Engineers (ASCE), 2019-02-01)
Although the line-of-balance (LOB) method is widely used for the scheduling of repetitive construction projects, there are only a limited number of studies that deal with the issue of how to incorporate uncertainty in repetitive schedules. In this paper, a delay risk assessment method is proposed for projects scheduled by LOB. In the proposed method, a LOB schedule is prepared considering the target rate of delivery, and then risk scenarios are defined considering the sources of uncertainty and vulnerabilit...
Uncertainty Analysis of Heat Transfer Predictions Using Statistically Modeled Data From a Cooled 1-1/2 Stage High-Pressure Transonic Turbine
Kahveci, Harika Senem (ASME International, 2014-06-01)
This paper compares predictions from a 3D Reynolds-averaged Navier-Stokes code and a statistical representation of measurements from a cooled 1-1/2 stage high-pressure transonic turbine to quantify predictive process sensitivity. A multivariable regression technique was applied to both the inlet temperature measurements obtained at the inlet rake, the wall temperature, and heat transfer measurements obtained via heat-flux gauges on the blade airfoil surfaces. By using the statistically modeled temperature p...
Uncertainty assessment of satellite- and model-based precipitation products over complex terrain of Turkey
Amjad, Muhammad; Yılmaz, Mustafa Tuğrul; Yücel, İsmail; Yılmaz, Koray Kamil (2019-04-07)
This study evaluates satellite-based (TMPA 3B42V7 and GPM IMERGv5) and model-based (ECMWF ERAInterim) precipitation products by using ground-based gauge stations as reference over Turkey, characterized by complex topography. Assessments of the products are performed over the nearest grids to the gauge stations (a total of 851) at daily, monthly and annual time scales. The accuracy assessments, categorical performance indices, and intensity-frequency related comparisons are performed over each station betwee...
Citation Formats
B. Arıkan, “Descriptive analysis of the inter-provincial migration:GAP Region 1975-80 and 1980-85,” Middle East Technical University, 1994.