Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Optimal scope of work for international integrated systems
Download
index.pdf
Date
2005
Author
Ertem, Mustafa Alp
Metadata
Show full item record
Item Usage Stats
316
views
85
downloads
Cite This
This study develops a systems integration project scheduling model which identifies the assignment of activity responsibilities that minimizes expected project implementation cost, considering the project risk. Assignment of resources to the individual jobs comprising the project is a persistent problem in project management. Mostly, skilled labor is an essential resource and both the time and the cost incurred to perform a job depend on the resource to which job is assigned. A systems integration project includes implementation issues in the areas of shipping, installation, and commissioning. Implementation problems lead to project delays, increased costs, and decreased performance, leading to customer dissatisfaction with the systems integrator. Activities can be performed in one of three ways: by the integrator, by the customer, or jointly between the integrator and customer. In this study we select the performer (mode) of each activity comprising the project network while taking into consideration the varying cost, duration and extreme event probability of each activity among different modes-integrator, joint work and customer. Use of the model will permit customers and integrators to mutually agree on an appropriate assignment of responsibilities in the contract. Systems integrators can also use the model to improve their implementation services offerings. An experimental design and a Monte-Carlo simulation study were conducted to see the effects of the parameters of the problem on the selection of modes.
Subject Keywords
General Science.
URI
http://etd.lib.metu.edu.tr/upload/12606209/index.pdf
https://hdl.handle.net/11511/15231
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
A robust bi-objective mathematical model for disaster rescue units allocation and scheduling with learning effect
Tirkolaee, Erfan Babaee; Aydin, Nadi Serhan; Ranjbar-Bourani, Mehdi; Weber, Gerhard Wilhelm (Elsevier BV, 2020-11-01)
This paper proposes a novel bi-objective mixed-integer linear programming (MILP) model for allocating and scheduling disaster rescue units considering the learning effect. When a natural phenomenon (e.g., earthquake or flood) occurs, the presented decision support model is expected to help decision-makers of emergency relief centers to provide efficient planning for rescue units to minimize the total weighted completion time of rescue operations, as well as the total delay in rescue operations. The problem ...
Meta-Modeling of Complexity-Uncertainty-Performance Triad in Construction Projects
Dikmen Toker, İrem; Erol, Huseyin; Birgönül, Mustafa Talat (Informa UK Limited, 2020-07-01)
Although conceptualized in various ways within the project management literature, complexity is usually identified as one of the drivers of uncertainty, which may result in deviations from the expected project performance in the construction industry. Effective strategies to manage risk and complexity can only be formulated by understanding the complexity-uncertainty-performance triad in construction projects and modeling the non-linear interactions between these factors. In this study, a meta-modeling appr...
Beam search algorithm for capacity allocation problem in flexible manufacturing systems
Ozpeynirci, Selin Bilgin; Azizoğlu, Meral (Elsevier BV, 2009-05-01)
This study considers the operation assignment and tool allocation problem in flexible manufacturing systems. A set of operations together with their required tools are selected so as to maximize the total weight. The machines have limited time and tool magazine capacities and the tools are available in limited quantities. We develop a beam search algorithm and obtain near optimal solutions for large size problems very quickly.
Operation assignment and capacity allocation problem in automated manufacturing systems
Bilgin, Selin; Azizoğlu, Meral (Elsevier BV, 2009-03-01)
We address an operation assignment and capacity allocation problem that arises in semiconductor industries and flexible manufacturing systems. We assume the automated machines have scarce time and tool magazine capacities and the tools are available in limited quantities. The aim is to select a subset of operations with maximum total weight. We show that the problem is NP-hard in the strong sense, develop two heuristics and a Tabu Search procedure. The results of our computational tests have revealed that o...
SIMULATION CONCEPTS FOR INFORMATION-SYSTEM
MOURANT, RR; Tarı, Zehra Sibel (Elsevier BV, 1993-09-01)
Recent Improvements in document image systems and their low-cost implementation on networks of microcomputers is leading to the reengineering of many information systems. We describe how document image systems can be applied to information systems. In order to compare the performance of a conventional information system with one implemented with document imaging processing capability we conducted a discrete event simulation. We modeled the conventional information system for processing graduate student ...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
M. A. Ertem, “Optimal scope of work for international integrated systems,” M.S. - Master of Science, Middle East Technical University, 2005.