Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Meta-Modeling of Complexity-Uncertainty-Performance Triad in Construction Projects
Date
2020-07-01
Author
Dikmen Toker, İrem
Erol, Huseyin
Birgönül, Mustafa Talat
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
225
views
0
downloads
Cite This
Although conceptualized in various ways within the project management literature, complexity is usually identified as one of the drivers of uncertainty, which may result in deviations from the expected project performance in the construction industry. Effective strategies to manage risk and complexity can only be formulated by understanding the complexity-uncertainty-performance triad in construction projects and modeling the non-linear interactions between these factors. In this study, a meta-modeling approach was utilized for understanding complex interactions within the triad. Using a database of projects from the seed scenarios developed by experts, a Bayesian Belief Network (BBN) meta-model was constructed for capturing complex interactions across the triad. Shapley value from Game Theory was adapted to assess the output of the BBN meta-model for establishing the relative contribution of complexity and uncertainty factors to project performance while considering the efficacy of potential strategies. The output of the Shapley value analysis was used to develop an Artificial Neural Network (ANN) model for predicting project performance. The application of the proposed methodology was demonstrated through a case study involving experts from an international construction company. The results clearly manifest the merits of integrating these approaches in a unique order in that BBNs are useful for understanding the holistic account of complex interdependencies involved in construction projects, utilization of Shapley value helps in establishing the relative importance of factors across a BBN meta-model and allocating limited resources to manage project complexity and uncertainty, and ANNs exhibit an improved accuracy in predicting the project performance given the relative importance established across complexity and uncertainty factors. The findings from the case study demonstrate that the proposed methodology can be used to understand how performance may change with respect to different combinations of implemented strategies, complexity and uncertainty factors.
Subject Keywords
General Engineering
URI
https://hdl.handle.net/11511/37479
Journal
ENGINEERING MANAGEMENT JOURNAL
DOI
https://doi.org/10.1080/10429247.2020.1772698
Collections
Department of Civil Engineering, Article
Suggestions
OpenMETU
Core
Mapping Uncertainty for Risk and Opportunity Assessment in Projects
Qazi, Abroon; Dikmen Toker, İrem; Birgönül, Mustafa Talat (Informa UK Limited, 2019-01-01)
Risk management is deemed as a critical process toward achieving the objectives of any project. A number of tools and techniques have been developed to help project managers reduce the risk involved in complex projects as risk is generally perceived as a negative event. However, uncertainty, which may lead to risk events may well result in opportunities. With the main aim of managing both risk and opportunity within an interdependent setting of interacting project uncertainties, we present a new thinking, c...
Optimum design of pın-jointed 3-D dome structures using global optimization techniques
Saraç, Yavuz; Hasançebi, Oğuzhan; Department of Civil Engineering (2005)
Difficult gradient calculations, converging to a local optimum without exploring the design space adequately, too much dependency on the starting solution, lacking capabilities to treat discrete and mixed design variables are the main drawbacks of conventional optimization techniques. So evolutionary optimization methods received significant interest amongst researchers in the optimization area. Genetic algorithms (GAs) and simulated annealing (SA) are the main representatives of evolutionary optimization m...
Assessment of dynamic response FD algorithms by beam and plate FE computations
Alaylioglu, H.; Oral, Süha; Alaylıoğlu, Ayşe (Elsevier BV, 1988-10)
Improvement in understanding of the process of direct integration of the equations of motion through numerical dissipation parameter interaction is being regarded as one of the significant achievements of structural dynamics research over the past quarter century. The numerical software fraternity has extended one-step integration algorithms, emphasizing controllable approximation characteristics with respect to such factors as period elongation and amplitude decay. These studies have resulted in setting up...
Influence of idealized pushover curves on seismic response
Kadaş, Koray; Yakut, Ahmet; Department of Civil Engineering (2006)
Contemporary approach performance based engineering generally relies on the approximate procedures that are based on the use of capacity curve derived from pushover analysis. The most important parameter in the displacement-based approach is the inelastic displacement demand computed under a given seismic effect and the most common procedures employed for this estimation; the Capacity Spectrum Method and the Displacement Coefficient Method are based on bi-linearization of the capacity curve. Although there ...
Optimal scope of work for international integrated systems
Ertem, Mustafa Alp; Serpil, Canan; Department of Industrial Engineering (2005)
This study develops a systems integration project scheduling model which identifies the assignment of activity responsibilities that minimizes expected project implementation cost, considering the project risk. Assignment of resources to the individual jobs comprising the project is a persistent problem in project management. Mostly, skilled labor is an essential resource and both the time and the cost incurred to perform a job depend on the resource to which job is assigned. A systems integration project i...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
İ. Dikmen Toker, H. Erol, and M. T. Birgönül, “Meta-Modeling of Complexity-Uncertainty-Performance Triad in Construction Projects,”
ENGINEERING MANAGEMENT JOURNAL
, pp. 0–0, 2020, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/37479.