Feasibility study of a hydropower project: case study of Niksar HEPP, Turkey

Download
2010
Mutlu, Reyhan
Hydropower helps countries meet their energy needs in an economically, environmentally, and socially sustainable way while saving money and increasing energy security and self-reliance. Being one of the fastest developing countries, electricity demand of Turkey has been increasing and is expected to increase in the future. Untapped hydropower potential is among the prospective alternative resources to supply this demand. Developing a hydropower project requires a great deal of expertise in multiple disciplines. RETScreen software developed by CanmetENERGY helps the planners and decision makers to assess the feasibility of renewable energy projects at the pre-feasibility and feasibility stages. This study is an application of RETScreen to assess the feasibility of alternative formulations for Niksar HEPP, a small hydropower project which is under construction in Turkey. Three alternative formulations are generated and their economic performances are evaluated and compared. First, optimum design discharges are calculated and then economical analysis is conducted for various electricity export rates by RETScreen for all the alternatives. This study provides a detailed literature review on hydropower and its economical, social and environmental aspects, and shows how RETScreen can be used in assessing the economical feasibilities of the current formulation for Niksar HEPP and its alternative schemes.

Suggestions

Feasibility study of multiple hydropower project: case study of Baltacı stream, Trabzon, Turkey
Aydın, Boran Ekin; Kentel Erdoğan, Elçin; Altınbilek, Doğan H.; Department of Civil Engineering (2010)
High greenhouse gas emissions increased the importance of renewable energy resources. Hydropower is among the most widely used type of renewable energy. Oppositions to big hydropower projects with reservoirs increased the use of small hydropower plants. Development of a small hydropower project is a challenging engineering task. Different software’s are developed and used to make initial estimations of energy generation and initial costs of the project. RETScreen Clean Energy Analysis Software which can be ...
Feasibility of a supplementary water storage for birkapili hydroelectric power plant
Bozkurt, Melih; Yanmaz, Ali Melih; Bakır, Nadi; Department of Civil Engineering (2011)
Climate change concerns, high oil prices and increasing government support are some of the driving reasons of increasing renewable energy legislation, incentives, and commercialization. Hydroelectricity is the most widely used form of renewable energy and refers to electricity generated by hydropower. In this study, a storage facility is proposed to store some additional water and increase the profitability of the existing Birkapılı Hydroelectric Power Plant. The storage facility is composed of a gravity da...
Development of the rule curve for Altıparmak hydroelectric power plant
Boyacıoğlu, Şerife Ece; Kentel Erdoğan, Elçin; Yanmaz, Ali Melih; Department of Civil Engineering (2013)
Energy requirement of Turkey increases day by day and hydropower is currently the main renewable energy source of the country. Thus, planning the development of the unused hydropower potential of Turkey is critical. Available water resources have to be developed and managed in a wise manner. Reservoir operation rule curves are fundamental guidelines for long term reservoir operation. Rule curve which results in the maximum energy generation has to be developed for each hydropower plant (HEPP). The goal of t...
A decision support tool for feasibility assessment of hydro electrical power plant projects
Ercan, Noyan; Birgönül, Mustafa Talat; Dikmen Toker, İrem; Department of Civil Engineering (2011)
The objective of this thesis is to develop a decision support tool to assess the feasibility of a hydro electrical power plant (HEPP) investment option by estimating its profitability under various scenarios. The decision support tool may help the decision makers to understand critical parameters that affect the internal rate of return (IRR) of a HEPP investment, create realistic scenarios by assigning different values to these parameters and monitor profitability under various scenarios. The information an...
Sustainability assessment of a hydropower project: a case study of Kayraktepe dam and Hepp
Öztürk, Ayça; Tiğrek, Şahnaz; Department of Civil Engineering (2011)
Nowadays, the world faces with lack of electricity access, water scarcity, climate change and global warming. The hydropower industry has a crucial role to deal with these problems as well as to develop projects for sustainable development. However, if social, environmental and economical impacts of a hydroelectric power plant (HEPP) project are not considered, it might lead to irreparable destructions. Nowadays, in Turkey, due to social and environmental problems resulting from hydropower projects, the opp...
Citation Formats
R. Mutlu, “Feasibility study of a hydropower project: case study of Niksar HEPP, Turkey ,” M.S. - Master of Science, Middle East Technical University, 2010.