Alternative feasibility studies for Altıparmak Dam and HEPP

Download
2011
Ak, Mümtaz
Hydropower is the most important domestic energy source of Turkey. Thus, wise planning and development of the unused hydropower potential of the country is vital. There are many hydroelectric power plants under planning stage in our country. Altıparmak HEPP is one of them. General Directorate of Electrical Power Resources Survey and Development Administration (EİE) and ANC Enerji conducted two separate feasibility studies for Altıparmak HEPP in 2001 and 2009, respectively. Traditionally, the energy income calculations for HEPPs are based on DSİ or EİE Methods in Turkey. Both of these methods evaluate the firm and the secondary energy generations separately. Besides they use fixed prices for these two types of energies. However, hourly electricity prices are used for electricity trading in Turkey. A detailed economic analysis of Altıparmak HEPP is conducted in this study. The economic analysis included various factors, such as tailwater level change, varying operating levels for different seasons and precipitation and evaporation amounts which are not conventionally included in feasibility studies. Moreover, the energy income calculations are conducted with four different methods, the DSİ Method, the EİE Method, the ANC Method and the Variable Price Method (VPM). The VPM is developed in this study and it allows utilization of hourly electricity prices in calculating energy income of the HEPP. To shed some light on how hourly electricity prices develop, this thesis includes a chapter on the electricity market which explains the details of electricity trading in our country after the Electricity Market Balancing and Settlement Regulation became active in 2009.

Suggestions

Development of the rule curve for Altıparmak hydroelectric power plant
Boyacıoğlu, Şerife Ece; Kentel Erdoğan, Elçin; Yanmaz, Ali Melih; Department of Civil Engineering (2013)
Energy requirement of Turkey increases day by day and hydropower is currently the main renewable energy source of the country. Thus, planning the development of the unused hydropower potential of Turkey is critical. Available water resources have to be developed and managed in a wise manner. Reservoir operation rule curves are fundamental guidelines for long term reservoir operation. Rule curve which results in the maximum energy generation has to be developed for each hydropower plant (HEPP). The goal of t...
Renewable energy planning in Turkey with a focus on hydropower
Gök, Emre; Kentel Erdoğan, Elçin; Department of Civil Engineering (2013)
As a country highly dependent on foreign fossil fuel sources, Turkey experiences many problems due to its increasing energy consumption in parallel with increasing population and rapid economic growth. Foreign fossil fuel dependency adversely affects sustainable development of the country by hindering its economic development. Because of this, renewable energy sources of the country should be evaluated and developed as soon as possible. Prioritization of the development of renewable energy sources to increa...
Optimisation of the Tigris river hydropower system operations
Yalçın, Emrah; Tiğrek, Şahnaz; Department of Civil Engineering (2015)
Growing external energy dependence and rising oil prices are encouraging Turkey to turn to renewable energy, especially hydropower. The amended legislation on the transference of the operational rights of existing, under-construction and planned hydropower plants to the private sector and the allocation of water right licenses to develop new projects for electricity production has led to a drastic decrease of the public share in production. Consequently, conflicts related to the operation of reservoirs have...
A comparative study on energy income estimation: A case study in Turkey
AK, MÜMTAZ; Yanmaz, Ali Melih; Kentel Erdoğan, Elçin (2014-10-01)
Hydropower is the main domestic energy resource of Turkey. The total gross and the economically feasible hydropower potentials of Turkey are estimated as 433 TWh/yr and 127 TWh/yr, respectively, by the General Directorate of State Hydraulic Works (DSI) of the Ministry of Forestry and Water Affairs.(1) Approximately 35% of the economically feasible hydropower potential is currently being utilized. The government accelerated the development of the unused potential by enabling the private sector to build and o...
Operation of cascade dams considering various scenarious and financial analysis of scenarious
İmamoğlu, Berker Yalın; Akyürek, Sevda Zuhal; Department of Civil Engineering (2013)
In assuring the energy supply of Turkey, hydroelectric energy plays one of the most important roles in plans formulated to realize equilibrium between energy production and consumption. Hydroelectric power plants on Murat River, a tributary of Euphrates, is a part of the development plan for energy production. Operation of four dams in cascade on Murat River are simulated by using program package HECResSim. For this purpose, ten scenarios are formulated to utilize the hydraulic potential of Murat River betw...
Citation Formats
M. Ak, “Alternative feasibility studies for Altıparmak Dam and HEPP,” M.S. - Master of Science, Middle East Technical University, 2011.