A Mixed integer second order cone programming reformulation for a congested location and capacity allocation problem on a supply chain network

Download
2013
Salimian, Mohammad
Supply chain network design involves location decisions for production facilities and distribution centers. We consider a make-to-order supply chain environment where distribution centers serve as crossdocking terminals. Long waiting times may occur at a cross-docking terminal, unless su cient handling capacity is installed. In this study, we deal with a facility location problem with congestion e ects at distribution centers. Along with location decisions, we make capacity allocation (service rate) and demand allocation decisions so that the total cost, including facility opening, transportation and congestion costs, is minimized. Response time to customer orders is a critical performance measure for a supply chain network. The decisions like where the plants and distribution centers are located a ect the response time of the system. Response time is more sensitive to these decisions in a make-to-order business environment. In a distribution network where distribution centers function as cross-docking terminals, capacity or the service rate decisions also a ect the response time performance. This study is closely related to a recent work Vidyarthi et al. (2009) which models distribution centers asM/G/1 queuing systems. They use the average waiting time formula ofM/G/1 queuing model. Thus, the average waiting time at a distribution center is a nonlinear function of the demand rate allocated to and the service rate available at the distribution center. The authors Vidyarthi et al. (2009) propose a linear approximation approach and a Lagrangian based heuristic for the problem. Di erent than the solution approach proposed in Vidyarthi et al. (2009), we propose a closed form formulation for the problem. In particular, we show that the waiting time function derived from M/G/1 queuing model can be represented via second order conic inequalities. Then, the problem becomes a mixed integer second order cone programming problem which can be solved by using commercial branch-and-bound software such as IBM ILOG CPLEX. Our computational tests show that proposed reformulation can be solved in reasonable CPU times for practical size instances.

Suggestions

Analysis of price-only and revenue sharing contracts in a reverse supply chain
Biazaran, Majid; Bakal, İsmail Serdar; Department of Industrial Engineering (2016)
Original Equipment Manufacturers prefer to fully or partially outsource take-back activities, such as used product acquisition and handling, since dealing with reverse flow of goods is not their core competency. However, outsourcing may cause the supply chain to suffer from local optimization that results from decentralization. In such cases, different forms of contracts are offered to reduce the effects of decentralization. In this study, we consider a two-echelon reverse supply chain where a remanufacture...
A Quality model for cloud-based enterprise information systems
Şener, Umut; Eren, Pekin Erhan; Department of Information Systems (2016)
Organizations have migrated from on-premise enterprise information systems to Cloud-based Enterprise Information Systems (Cloud-EIS) due to the benefits of cloud computing, such as flexibility, availability on demand, and interdependence in information technology infrastructure. Accordingly, enterprises perceive the significance of the quality of Cloud-EIS for improving their businesses, and they pay more attention to selecting the suitable Cloud-EIS. Having looked at the extensive literature, only a few re...
Joint quantity flexibility under market information update
Oskay, Mine Gülden; Bakal, İsmail Serdar; Department of Industrial Engineering (2013)
In this study, we consider a decentralized supply chain consisting of a single retailer and a single manufacturer who manufacture two products in a given single period. The retailer commits to purchase an aggregate order quantity for the products at the beginning of the period before information on the market condition is revealed. Accordingly, the manufacturer then determines its initial production quantities for the products. Once market condition is revealed the retailer allocates its initial order to in...
City logistics system design under cost uncertainty
Kunter, Utku Can; İyigün, Cem; Süral, Haldun; Department of Industrial Engineering (2015)
City Logistics (CL) is a quickly developing area of research aiming to develop the methods for designing efficient and effective freight distribution networks. We make an extensive review on CL as well as studies related to CL in order to describe the position of CL in the literature. Based on this review, the location and allocation decisions in a CL system under transportation cost uncertainty is analyzed from a strategic point of view. We use Value of Information analysis to compare different formulation...
A Method and tool support for integrated business process modeling and ontology development
Coşkunçay, Ahmet; Demirörs, Onur; Department of Information Systems (2016)
From knowledge management point of view, business process models and ontologies are two essential knowledge artifacts for organizations that consume similar information sources. In this sense, building and managing the relationships between ontologies and business process models provide benefits such as enhanced semantic quality of both artifacts and effort savings. A method and tool support could guide integrated business process modeling and ontology building, and therefore enhance their semantic quality ...
Citation Formats
M. Salimian, “A Mixed integer second order cone programming reformulation for a congested location and capacity allocation problem on a supply chain network,” M.S. - Master of Science, Middle East Technical University, 2013.