Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
A Decision support tool for contingency and profit analysis of international construction portfolios
Download
index.pdf
Date
2015
Author
Özçelik, Nizami
Metadata
Show full item record
Item Usage Stats
208
views
91
downloads
Cite This
In construction sector, estimations of contingency and profit amounts are generally based on experience and intuition. However, the relation between the desired profit amount and the risk undertaken is not considered usually during profit setting. In addition, most of the studies in the literature have been focused on a single project’s contingency rate, but many construction companies carry out several projects simultaneously. Contingency-profit analysis for portfolios of projects is very important to evaluate the adequacy of the expected profit in terms of the risks undertaken for construction companies. This study aims to fill the mentioned gaps in contingency-profit evaluation for portfolios of international construction projects by developing a decision support tool. The developed tool estimates portfolio contingency rates by using a method that integrates regression analysis and bootstrap method, and this method includes the advantages of parametric and probabilistic estimating methods at the same time. The proposed tool will show the condition of portfolio on the risk-profit evaluation graph. In this way, the tool enables companies to decide on sufficiency of the expected profit rate in response to the undertaken risks. Moreover, the decision support tool provides a contingency range for the planned portfolio, and the obtained range enables contractors to evaluate their portfolios in different cases. In this thesis, the presented tool for contingency and profit analysis of international construction portfolios is introduced using a sample portfolio that consists of international construction projects. The developed decision support tool enables contractors to perform overall risk return analysis of their portfolio to achieve adequate contingency and profit decisions during bidding for international projects.
Subject Keywords
Construction projects.
,
Regression analysis.
,
Portfolio management.
,
Construction industry
,
Contingency theory (Management).
,
Construction industry
URI
http://etd.lib.metu.edu.tr/upload/12619235/index.pdf
https://hdl.handle.net/11511/24971
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
A Decision Support System for Project Portfolio Management in Construction Companies
Bilgin, Gozde; Dikmen Toker, İrem; Birgönül, Mustafa Talat; ÖZORHON ORAKÇAL, BELİZ (2022-11-01)
Project portfolio management requires a systematic process that comprises assessment of portfolio risk and expected profitability, as well as strategic fit of individual projects with company objectives. After a needs analysis based on literature findings and surveys with experts, in this study, a process model and a tool, COPPMAN (COnstruction Project Portfolio MANagement), were developed to support project portfolio decisions in construction companies. COPPMAN was developed in collaboration with construct...
A Hybrid genetic algorithm for multi mode resource constrained scheduling problem for large size projects
Gürel, Mustafa; Sönmez, Rifat; Department of Civil Engineering (2015)
Just like in all industries, some of the available resources, in order to finish a project on time, are constrained in construction industry. To be able to finish the project on time has high importance both for the contractor and for the owner. Project scheduling in which resources are limited for a particular time are called as resource constrained project scheduling problems (RCPSP) and occupies a significant place in construction management. Especially for large scale projects, little success has been a...
A Multi agent risk analysis and sharing platform for international construction projects
Dağkıran, Gülşah; Dikmen Toker, İrem; Tanyer, Ali Murat; Department of Civil Engineering (2015)
The risks and complexities that are naturally inherent with construction projects and the diverging interests of the parties involved, cause deviations from the project objectives and make claims an unavoidable consequence in construction projects. Risk management is accepted as one of the critical success factors to handle the claim management process effectively. In construction management literature, while there are several studies to develop a mechanism for risk management, decision making and dispute r...
A lessons learned database structure for construction companies
Eken, Görkem; Dikmen Toker, İrem; Birgönül, Mustafa Talat (2015-06-24)
Knowledge management in project based industries is critical as in the case of construction industry. Besides being a project based industry, factors specific to construction projects also make it harder to capture knowledge. Construction projects are held in dispersed locations, by different parties involved, with variable objectives; all of which make capturing the information more difficult and knowledge management process more complex. This study presents a database structure and an information system t...
A Support vector regression method for conceptual cost estimate of construction projects
Yolasığmaz, İsmet Berki; Sönmez, Rifat; Department of Civil Engineering (2015)
Conceptual cost estimate is very important for initial project decisions when the design information is limited and the scope is not finalized at the early stages of the construction projects. It has serious effects on planning, design, cost management and budgeting. Therefore, the decision makers should be as accurate as possible while estimating the conceptual cost at the initial stage since a misestimation on the conceptual cost may lead to serious problems during feasibility analysis or at the later sta...