Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Energy conscious scheduling in a two-machine robotic cell
Download
index.pdf
Date
2017
Author
Akhlaghi, Vahid Eghbal
Metadata
Show full item record
Item Usage Stats
187
views
90
downloads
Cite This
Robotic cells usually operate under time pressure to minimize time related objectives such as cycle time, makespan, and tardiness. Robot moves constitute a significant portion of cycle time. Also, robots consume significant amount of energy determined by the speeds and distances of their moves. We study the tradeoff between the cycle time and energy consumption of a robot in a two machine flexible robotic cell which processes identical parts. In this system, the loading and unloading of machines are made by a robot. Each machine performs a different operation on each part and the robot moves linearly along a track. There are alternative cyclic schedules for such a cell and each cycle involves a number of different robot moves. Energy consumption of a robot can be formulated as a convex function of its speed, since the energy consumption increases with the speed. Given a cycle time, we find optimal speeds for different robot moves in robotic cell cycles. We determine the best cyclic schedule and the optimal robot speeds that minimize the total energy consumption. Furthermore, we generate efficient frontier for energy consumption and cycle time objectives for a number of examples.
Subject Keywords
Robots, Industrial.
,
Mathematical optimization.
,
Flexible manufacturing systems.
URI
http://etd.lib.metu.edu.tr/upload/12620813/index.pdf
https://hdl.handle.net/11511/26354
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
Energy conscious scheduling of a material handling robot in a manufacturing cell
Gürel, Sinan; Akhlaghi, Vahid Eghbal (Elsevier BV, 2019-08-01)
In cyclic scheduling of material handling robots in manufacturing cells, a common approach is to minimize the cycle time objective, which is a measure of the throughput of the cell. In a typical robot move cycle, robot move times constitute a significant portion of the cycle time. During handling operations, robots consume significant amount of energy, which is determined by their speed, load and the distance they travel. In this paper, we propose considering robot speed decisions along with robot move sequ...
Rescheduling with controllable processing times for number of disrupted jobs and manufacturing cost objectives
Gürel, Sinan (2015-05-03)
We consider a machine rescheduling problem that arises when a disruption such as machine breakdown occurs to a given schedule. Machine unavailability due to a breakdown requires repairing the schedule as the original schedule becomes infeasible. When repairing a disrupted schedule a desirable goal is to complete each disrupted job on time, i.e. not later than the planned completion time in the original schedule. We consider the case where processing times of jobs are controllable and compressing the process...
Due date and cost-based FMS loading, scheduling and tool management
Turkcan, Ayten; Akturk, M. Selim; Storer, Robert H. (Informa UK Limited, 2007-03-01)
In this study, we consider flexible manufacturing system loading, scheduling and tool management problems simultaneously. Our aim is to determine relevant tool management decisions, which are machining conditions selection and tool allocation, and to load and schedule parts on non-identical parallel CNC machines. The dual objectives are minimization of the manufacturing cost and total weighted tardiness. The manufacturing cost is comprised of machining and tooling costs (which are affected by machining cond...
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Tokdemir, Onur Behzat; Dikmen Toker, İrem (American Society of Civil Engineers (ASCE), 2019-02-01)
Although the line-of-balance (LOB) method is widely used for the scheduling of repetitive construction projects, there are only a limited number of studies that deal with the issue of how to incorporate uncertainty in repetitive schedules. In this paper, a delay risk assessment method is proposed for projects scheduled by LOB. In the proposed method, a LOB schedule is prepared considering the target rate of delivery, and then risk scenarios are defined considering the sources of uncertainty and vulnerabilit...
Working time constraints in operational fixed job scheduling
Eliiyi, Deniz Tuersel; Azizoğlu, Meral (Informa UK Limited, 2010-01-01)
In this study we consider the operational fixed job scheduling problem under working time limitations. The problem has several practical implications in both production and service operations; however the relevant research is scarce. We analyse pre-emptive and non pre-emptive versions of the problem and its special cases. We provide polynomial-time algorithms for some special cases. We show that the non pre-emptive jobs problem is strongly NP-hard, and propose a branch-and-bound algorithm that employs effic...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
V. E. Akhlaghi, “Energy conscious scheduling in a two-machine robotic cell,” M.S. - Master of Science, Middle East Technical University, 2017.