Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Conceptual cost estimation of building projects with regression analysis and neural networks
Date
2004-08-01
Author
Sönmez, Rifat
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
284
views
0
downloads
Cite This
Conceptual cost estimates play a crucial role in initial project decisions, although scope is not finalized and very limited design information is available during early project stages. In this paper, the advantages and disadvantages of the current conceptual cost estimation methods are discussed and the use of regression, neural network, and range estimation techniques for conceptual cost estimation of building projects are presented. Historical cost data of continuing care retirement community projects were compiled to develop regression and neural network models. Three linear regression models were considered to identify the significant variables affecting project cost. Two neural network models were developed to examine the possible need for nonlinear or interaction terms in the regression model. Prediction intervals were constructed for the regression model to quantify the level of uncertainty for the estimates. Advantages of simultaneous use of regression analysis, neural networks, and range estimation for conceptual cost estimating are discussed.
Subject Keywords
Degradation pattern
,
Hydrocarbon bioremediation
,
Kerosene
,
N-alkanes
URI
https://hdl.handle.net/11511/32794
Journal
CANADIAN JOURNAL OF CIVIL ENGINEERING
DOI
https://doi.org/10.1139/l04-029
Collections
Department of Civil Engineering, Article
Suggestions
OpenMETU
Core
Conceptual cost estimating of urban railway system projects
Öntepeli, Mehmet Bahadır; Sönmez, Rifat; Department of Civil Engineering (2005)
Conceptual cost estimates play a crucial role on initial project decisions although scope is not finalized and very limited design information is available during early project stages. At these stages, cost estimates are needed by the owner, contractor, designer or the lending organization for several purposes including; determination of feasibility of a project, financial evaluation of a number of alternative projects or establishment of an initial budget. Conceptual cost estimates are not expected to be p...
A Support vector regression method for conceptual cost estimate of construction projects
Yolasığmaz, İsmet Berki; Sönmez, Rifat; Department of Civil Engineering (2015)
Conceptual cost estimate is very important for initial project decisions when the design information is limited and the scope is not finalized at the early stages of the construction projects. It has serious effects on planning, design, cost management and budgeting. Therefore, the decision makers should be as accurate as possible while estimating the conceptual cost at the initial stage since a misestimation on the conceptual cost may lead to serious problems during feasibility analysis or at the later sta...
Future of green building contracts in Turkey
Mohammadi, Sahra; Birgönül, Mustafa Talat; Dikmen Toker, İrem; Department of Civil Engineering (2015)
Conceptual cost estimate is very important for initial project decisions when the design information is limited and the scope is not finalized at the early stages of the construction projects. It has serious effects on planning, design, cost management and budgeting. Therefore, the decision makers should be as accurate as possible while estimating the conceptual cost at the initial stage since a misestimation on the conceptual cost may lead to serious problems during feasibility analysis or at the later sta...
Comparison of parametric models for conceptual duration estimation of building projects
Helvacı, Aziz; Sönmez, Rifat; Department of Civil Engineering (2008)
Estimation of construction durations is a very crucial part of project planning, as several key decisions are based on the estimated durations. In general, construction durations are estimated by using planning and scheduling techniques such as Gannt or bar chart, the Critical Path Method (CPM), and the Program Evaluation and Review Technique (PERT). However, these techniques usually require detailed design information for estimation of activity durations and determination of the sequencing of the activitie...
Conceptual quantity modeling of single span highway bridges by regression, neural networks and case based reasoning methods
Aşıkgil, Mert; Sönmez, Rifat; Department of Civil Engineering (2012)
Conceptual estimation techniques play an important role in determining the approximate costs of construction projects especially during feasibility stages. Moreover, pre-design estimates are also crucial for the contractors. With the help of the conceptual predictions companies can determine approximate project costs and can gain several advantages before tendering phase. The main objective of this thesis is to focus on modeling of quantities instead of costs and to develop quantity take-off models for pre-...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
R. Sönmez, “Conceptual cost estimation of building projects with regression analysis and neural networks,”
CANADIAN JOURNAL OF CIVIL ENGINEERING
, pp. 677–683, 2004, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/32794.