Scheduling methods for linear projects a comprehensive study

Download
1990
Rabie, Mounzer

Suggestions

Scheduling approaches for parameter sweep applications in a heterogeneous distributed environment
Karaduman, Gülşah; Şener, Cevat; Alpdemir, Mahmut Nedim; Department of Computer Engineering (2010)
In this thesis, the focus is on the development of scheduling algorithms for Sim-PETEK which is a framework for parallel and distributed execution of simulations. Since it is especially designed for running parameter sweep applications in a heterogeneous distributed computational environment, multi-round and adaptive scheduling approaches are followed. Five different scheduling algorithms are designed and evaluated for scheduling purposes of Sim-PETEK. Development of these algorithms are arranged in a way t...
Scheduling algorithms for wireless cdma networks
Hakyemez, Serkan Ender; Schmidt, Şenan Ece; Department of Electrical and Electronics Engineering (2007)
In recent years the need for multimedia packet data services in wireless networks has grown rapidly. To overcome that need third generation (3G) mobile services have been proposed. The fast growing demands multimedia services in 3G services brought the need for higher capacity. As a result of this, the improvement on throughput, traffic serving performance has become necessary in 3G systems. Code division multiple access (CDMA) technique is one of the most important 3G wireless mobile techniques that has be...
Scheduling system for repetitive unit construction using line-of-balance technology
Arditi, David; Tokdemir, Onur Behzat; Suh, Kangsuk (2001-02-01)
Although line-of-balance (LOB) scheduling can be superior to bar charts and networks in repetitive-unit construction, there are indications that its use is not widespread. In this study, the major limitations of the existing LOB methodology are identified and then eliminated by developing a computer program called repetitive unit scheduling system (RUSS). An effective algorithm that facilitates the implementation of LOB scheduling is developed. A tool that handles logical and strategic limitations caused by...
Scheduling with dual performance measures: Total flowtime and number of tardy jobs.
Bekiroğlu, K Tuncay; Department of Industrial Engineering (1992)
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Tokdemir, Onur Behzat; Dikmen Toker, İrem (American Society of Civil Engineers (ASCE), 2019-02-01)
Although the line-of-balance (LOB) method is widely used for the scheduling of repetitive construction projects, there are only a limited number of studies that deal with the issue of how to incorporate uncertainty in repetitive schedules. In this paper, a delay risk assessment method is proposed for projects scheduled by LOB. In the proposed method, a LOB schedule is prepared considering the target rate of delivery, and then risk scenarios are defined considering the sources of uncertainty and vulnerabilit...
Citation Formats
M. Rabie, “Scheduling methods for linear projects a comprehensive study,” Middle East Technical University, 1990.