Periodic foodstuff markets and market traders in Ankara

Download
1988
Varcın, Recep

Suggestions

Fresh Fruit and Vegetable Wholesale Market for Ankara.
Akdamar, Cem; Department of Architecture (1966)
DAILY OPERATION OF A MULTIPURPOSE RESERVOIR SYSTEM
Yazıcıgil, Hasan; TOEBES, GERRIT H (1983-01-01)
An optimization model that may be used by reservoir system operators to improve daily, real‐time operations and to evolve better long‐term operating guidelines is developed and tested. The four multipurpose reservoirs in the Green River Basin (GRB) of Kentucky are used as a case study. The GRB Operation Optimization Model (GRBOOM) is a linear program constructed to imitate the decision‐ making process that results in actual reservoir release decisions. The model is easily modifiable and very flexible, which...
Unpredictable solutions of linear differential and discrete equations
Akhmet, Marat; Tleubergenova, Madina; Zhamanshin, Akylbek (2019-01-01)
The existence and uniqueness of unpredictable solutions in the dynamics of nonhomogeneous linear systems of differential and discrete equations are investigated. The hyperbolic cases are under discussion. The presence of unpredictable solutions confirms the existence of Poincare chaos. Simulations illustrating the chaos are provided.
Beforehand obtaining a safety operation condition by using daily load curves in transient stability and graphical software for transient stability applications
Öztop, Celal; Ertaş, Arif; Department of Electrical and Electronics Engineering (2005)
In this thesis, relationship between two most important transient stability indices, critical clearing time and generator rotor angle is examined for one machine-infinite bus system and then extended to the multimachine case and is observed to be linear. By using the linear relationship between critical clearing time and generator rotor angle and utilizing the daily load curve, a new preventive method is proposed. The aim of this method is to make all critical clearing times longer than the relay and circui...
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Tokdemir, Onur Behzat; Dikmen Toker, İrem (American Society of Civil Engineers (ASCE), 2019-02-01)
Although the line-of-balance (LOB) method is widely used for the scheduling of repetitive construction projects, there are only a limited number of studies that deal with the issue of how to incorporate uncertainty in repetitive schedules. In this paper, a delay risk assessment method is proposed for projects scheduled by LOB. In the proposed method, a LOB schedule is prepared considering the target rate of delivery, and then risk scenarios are defined considering the sources of uncertainty and vulnerabilit...
Citation Formats
R. Varcın, “Periodic foodstuff markets and market traders in Ankara,” Middle East Technical University, 1988.