Construction planning of PTT trainin center extention project.

1973
Gunsoy, Talat

Suggestions

Design construction and testing of aa new vane typee positive displacement pump.
Bamyacıoğlu, Ahmet; Department of Mechanical Engineering (1976)
Structural monitoring of andirap bridge for overload passage
Türer, Ahmet (2009-01-01)
Andirap bridge is located over Seyhan river passing a deep valley and has a big strategic importance since heavy loaded trucks carrying excavation and fill material from Kavsak Bendi hydroelectric power plant construction site have to use the bridge. Serious concerns were raised since Andirap bridge may not be adequately strong to carry about 250 trucks per day, each weighting more than 50 tons for the coming next two years. A preliminary visual and analytical evaluation of the bridge has leaded instrumente...
Design construction and operation of laboratory tilting flume.
Ayan, Mehmet Murat; Department of Civil Engineering (1978)
Design criteria of water supply systems used in Turkey.
Dogan, Serafettin; Department of Civil Engineering (1973)
ENGINEERING EVALUATION OF THE 1 OCTOBER 1995 DINAR EARTHQUAKE (ML=5.9)
Sucuoğlu, Haluk; Ergunay, Oktay; Gencoglu, Sinan (1997-01-01)
In 1995, a swarm of earthquakes affected the city of Dinar, Turkey, which is located in Southwest Anatolia and has a population of 35 000. The mainshock having a local magnitude of 5.9 occurred on 1 October 1995. It was preceded by foreshocks in the previous four days, the largest one with a magnitude of 4.7. These foreshocks initiated structural damage in many buildings, which was then severely aggravated by the mainshock and a strong aftershock two hours later, with a magnitude of 5.0. Numerous aftershock...
Citation Formats
T. Gunsoy, “Construction planning of PTT trainin center extention project.,” Middle East Technical University, 1973.