Application of the contingent valuation method in a developing country: a case study of the Yusufeli Dam in northeast Turkey
Download
index.pdf
Date
2010-01-01
Author
Alp, Emre
Yetiş, Ülkü
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
8
views
11
downloads
Hydroelectric power plants and dams often play an important role in developing countries in terms of their contribution to economy. In accordance with the energy policies of Turkish Republic, Yusufeli Dam and Hydroelectric Power Plant in Northeastern Turkey have been initiated. In this study, the Contingent Valuation Method (CVM) was conducted in Yusufeli Village to determine the environmental costs of the Yusufeli Project. The purpose is to assess the willingness to pay (WTP) of Yusufeli Village residents for restoration of the environmental impacts of the dam project and also to investigate the underlying economic, psychological, and social motivations for WTP. WTP was calculated as US$761 per person which can further be used in the cost-benefit analysis. The results from the study suggest that application of the CVM in rural and urban areas located in the same region can show differences.
Subject Keywords
Environmental Engineering
,
Water Science and Technology
URI
https://hdl.handle.net/11511/41614
Journal
WATER SCIENCE AND TECHNOLOGY
DOI
https://doi.org/10.2166/wst.2010.272
Collections
Department of Environmental Engineering, Article