Sensing and Field Data Capture for Construction and Facility Operations

2011-10-01
Taneja, Saurabh
akinci, burcu
garrett, james
soibelman, lucio
berges, mario
Atasoy Özcan, Güzide
LIU, XEUONG
SHAHANDASHTI, SM
ANIL, BURAK
ERGEN PEHLEVAN, ESİN
pradhan, anu
tang, pingbo
Collection of accurate, complete, and reliable field data is not only essential for active management of construction projects involving various tasks, such as material tracking, progress monitoring, and quality assurance, but also for facility and infrastructure management during the service lives of facilities and infrastructure systems. Limitations of current manual data collection approaches in terms of speed, completeness, and accuracy render these approaches ineffective for decision support in highly dynamic environments, such as construction and facility operations. Hence, a need exists to leverage the advancements in automated field data capture technologies to support decisions during construction and facility operations. These technologies can be used not only for acquiring data about the various operations being carried out at construction and facility sites but also for gathering information about the context surrounding these operations and monitoring the workflow of activities during these operations. With this, it is possible for project and facility managers to better understand the effect of environmental conditions on construction and facility operations and also to identify inefficient processes in these operations. This paper presents an overview of the various applications of automated field data capture technologies in construction and facility fieldwork. These technologies include image capture technologies, such as laser scanners and video cameras; automated identification technologies, such as barcodes and Radio Frequency Identification (RFID) tags; tracking technologies, such as Global Positioning System (GPS) and wireless local area network (LAN); and process monitoring technologies, such as on-board instruments (OBI). The authors observe that although applications exist for capturing construction and facility fieldwork data, these technologies have been underutilized for capturing the context at the fieldwork sites as well as for monitoring the workflow of construction and facility operations.
Journal Of Construction Engineering And Management-Asce

Suggestions

Contextual Information Requirements of Cost Estimators from Past Construction Projects
Kiziltas, Semiha; Akinci, Burcu (American Society of Civil Engineers (ASCE), 2009-09-01)
Past project data sources provide key information for construction cost estimators. Previous research studies show that relying only on one's own experience during estimation results in estimators' bias. Having and referring to historical databases, containing objective information on what happened in past projects, are essential for reducing estimators' biases. The first step toward development of useful project history databases is to understand what information estimators require from past projects. The ...
Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices
Birgönül, Mustafa Talat; Dikmen Toker, İrem (American Society of Civil Engineers (ASCE), 2015-04-01)
Many factors, such as unforeseeable events, managerial and financial problems of contractors, insufficient technical capacity of site teams of contractors or Consultants, and so on, may lead to delays in construction projects. Proper analysis of compensability and quantum of a delay event is of prime importance. Any delay analysis application can be considered as a result of the combination of contract documents, scheduler, record-keeping mechanism at the site, communication among project participants, dela...
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Tokdemir, Onur Behzat; Dikmen Toker, İrem (American Society of Civil Engineers (ASCE), 2019-02-01)
Although the line-of-balance (LOB) method is widely used for the scheduling of repetitive construction projects, there are only a limited number of studies that deal with the issue of how to incorporate uncertainty in repetitive schedules. In this paper, a delay risk assessment method is proposed for projects scheduled by LOB. In the proposed method, a LOB schedule is prepared considering the target rate of delivery, and then risk scenarios are defined considering the sources of uncertainty and vulnerabilit...
Fuzzy Structural Equation Model to Assess Construction Site Safety Performance
Gunduz, Murat; Birgönül, Mustafa Talat; Ozdemir, Mustafa (American Society of Civil Engineers (ASCE), 2017-04-01)
The main goal of this study is to examine the relationships between determinants of safety performance of construction sites. To achieve this goal, 168 observable variables and 16 latent dimensions that affect safety performance of construction sites were collected through extensive literature reviews, expert opinions, and face-to-face interviews. A questionnaire form was developed and administered to construction professionals as a data-collection tool about the observable variables and latent dimensions. ...
Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time-Cost Trade-Off Problem
Sönmez, Rifat; Uysal, Furkan (American Society of Civil Engineers (ASCE), 2016-03-01)
Despite the importance of project deadlines and resource constraints in construction scheduling, very little success has been achieved in solving the resource-constrained discrete time-cost trade-off problem (RCDTCTP), especially for large-scale projects. In this paper a new heuristic method is designed and developed to achieve fast and high-quality solutions for the large-scale RCDTCTP. The proposed method is based on the novel principles to enable effective exploration of the search space through adequate...