Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
E-bidding proposal preparation system for construction projects
Date
2006-10-01
Author
Arslan, Gohan
Tuncan, Mustafa
Birgönül, Mustafa Talat
Dikmen Toker, İrem
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
273
views
0
downloads
Cite This
The bidding process is one of the most important phases in the construction industry. The major objective of construction companies is to expand business volume by successful bidding on various projects. For this reason, companies must prepare realistic bid proposals. However, the traditional bidding process is time consuming and requires a great deal of effort. This paper proposes a model that enables the companies to reduce the bid proposal preparation time and cost by using e-technology.
Subject Keywords
Geography, Planning and Development
,
Environmental Engineering
,
Civil and Structural Engineering
,
Building and Construction
URI
https://hdl.handle.net/11511/42473
Journal
BUILDING AND ENVIRONMENT
DOI
https://doi.org/10.1016/j.buildenv.2005.05.024
Collections
Department of Civil Engineering, Article
Suggestions
OpenMETU
Core
Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES)
Arslan, Gokhan; Kivrak, Serkan; Birgönül, Mustafa Talat; Dikmen Toker, İrem (Elsevier BV, 2008-05-01)
One of the most important phases in the construction industry (CI) is the bidding process. During the bidding process, selecting the most appropriate sub-contractors (SCs) for the relevant sub-works is highly critical for the overall project performance. In order to select the most appropriate SCs for the project and prepare the most realistic and accurate bid proposal, general contractors (GCs) have to know all financial, technical and general information about these SCs. Within this context, GCs should co...
Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices
Birgönül, Mustafa Talat; Dikmen Toker, İrem (American Society of Civil Engineers (ASCE), 2015-04-01)
Many factors, such as unforeseeable events, managerial and financial problems of contractors, insufficient technical capacity of site teams of contractors or Consultants, and so on, may lead to delays in construction projects. Proper analysis of compensability and quantum of a delay event is of prime importance. Any delay analysis application can be considered as a result of the combination of contract documents, scheduler, record-keeping mechanism at the site, communication among project participants, dela...
Strategic use of quality function deployment (QFD) in the construction industry
Dikmen Toker, İrem; Birgönül, Mustafa Talat (Elsevier BV, 2005-02-01)
In this paper, an attempt has been made to examine the applicability of QFD as a strategic decision-making tool after the construction stage of a housing project to determine the best marketing strategy, to make a comparison between the performances of different competitors and to transfer the experience gained from the current project to the forthcoming projects. For this purpose, a QFD team has been formed to collect and verify the expectations of the customer profile of the sample project, which was a hi...
The evidence of poor quality in high rise and medium rise housing units: a case study of mass housing projects in Turkey
KAZAZ, AYNUR; Birgönül, Mustafa Talat (Elsevier BV, 2005-11-01)
Achievement of acceptable levels of quality in the construction industry has long been a problem. Great expenditures of time, money and resources are wasted each year due to inefficient or non-existent quality levels. The situation is even worse in the case of mass housing projects addressed to low and middle income groups. It is the scope of this paper to identify the type of deviations resulting in rework in mass housing projects. For this aim, a general knowledge concerning quality is given at first, and...
Cost effect of earthquake region and soil type for office buildings in Turkey
Kanit, Recep; Gunduz, Murat; Ozkan, Omer (Elsevier BV, 2007-10-01)
In this study, the change in the load-bearing system cost of a reinforced concrete office building has been investigated in relation to the earthquake regions and soil types. Three different office projects each with five stories were investigated. The structural design calculations have been made according to four different soil types and four different earthquake regions. According to each combination, concrete, steel and formwork adopted approximations were calculated to reach the rough cost of each offi...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
G. Arslan, M. Tuncan, M. T. Birgönül, and İ. Dikmen Toker, “E-bidding proposal preparation system for construction projects,”
BUILDING AND ENVIRONMENT
, pp. 1406–1413, 2006, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/42473.