From Risk Matrices to Risk Networks in Construction Projects

2019-01-01
Qazi, Abroon
Dikmen Toker, İrem
Risk management is considered as a vital process contributing to the successful outcome of a complex construction project in terms of achieving the associated project objectives. The widely used industrial practice in managing construction project risks is to assign probability and impact values to each risk and to map risks on a risk matrix. The main criticism of this practice relates to ignoring complex interdependencies between risks and using point estimates for probability and impact values. Furthermore, risks mapped on a matrix are deemed to influence a specific objective and there is a challenge involved in aggregating the impact of risks across multiple (conflicting) project objectives. Utilizing a data-driven Bayesian Belief Network methodology, in this paper we introduce a new process where the risks mapped on a risk matrix corresponding to each project objective are aggregated and modeled as a risk network, and a holistic impact of each risk is captured across the network by means of new risk metrics. The proposed methodology is demonstrated through a real application. The results specific to the two ranking schemes (assuming independence/interdependence of risks) are found to be negatively correlated, which substantiates the importance of utilizing an interdependency-based risk management process.
IEEE Transactions on Engineering Management

Suggestions

A critical review of risk management support tools
Dikmen Toker, İrem; Birgönül, Mustafa Talat (null; 2004-09-03)
It has been claimed by many researchers that "a risk driven approach" to project management is necessary to increase the success of construction projects. Literature is very rich in conceptual frameworks to overcome the informality of risk management efforts. However, risk management paradigms exist as methodologies rather than systems which can fully support the risk management process. The existing risk management support tools are usually based on quantitative risk analysis whereas the other phases are c...
A Decision Support System for Project Portfolio Management in Construction Companies
Bilgin, Gozde; Dikmen Toker, İrem; Birgönül, Mustafa Talat; ÖZORHON ORAKÇAL, BELİZ (2022-11-01)
Project portfolio management requires a systematic process that comprises assessment of portfolio risk and expected profitability, as well as strategic fit of individual projects with company objectives. After a needs analysis based on literature findings and surveys with experts, in this study, a process model and a tool, COPPMAN (COnstruction Project Portfolio MANagement), were developed to support project portfolio decisions in construction companies. COPPMAN was developed in collaboration with construct...
Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects
Aminbakhsh, Saman; Gunduz, Murat; Sönmez, Rifat (Elsevier BV, 2013-09-01)
Introduction: The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prio...
Mapping Uncertainty for Risk and Opportunity Assessment in Projects
Qazi, Abroon; Dikmen Toker, İrem; Birgönül, Mustafa Talat (Informa UK Limited, 2019-01-01)
Risk management is deemed as a critical process toward achieving the objectives of any project. A number of tools and techniques have been developed to help project managers reduce the risk involved in complex projects as risk is generally perceived as a negative event. However, uncertainty, which may lead to risk events may well result in opportunities. With the main aim of managing both risk and opportunity within an interdependent setting of interacting project uncertainties, we present a new thinking, c...
Exploring the Relationship between Complexity and Risk in Megaconstruction Projects
Erol, Huseyin; Dikmen, Irem; Atasoy Özcan, Güzide; Birgönül, Mustafa Talat (American Society of Civil Engineers (ASCE), 2020-12-01)
© 2020 American Society of Civil Engineers.Although complexity and risk are inherent characteristics of megaconstruction projects, existing project management approaches fail to incorporate complexity-based thinking into risk management. Complexity is usually considered as the source of risk events, along with uncertainty. However, prevailing risk management practices are oriented toward only handling the uncertainty. The lack of integration between the complexity and other risk-related concepts leads to un...
Citation Formats
A. Qazi and İ. Dikmen Toker, “From Risk Matrices to Risk Networks in Construction Projects,” IEEE Transactions on Engineering Management, pp. 0–0, 2019, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/44033.