Optimization of Aslantas water resources project by a modified benef-cost criterion.

1980
Ferahli, Abdulkadir

Suggestions

Optimization of hydroelectric power production of Sariyar and Gokcekaya reservoirs by dynamic programming.
Aygün, Ercan; Department of Civil Engineering (1978)
Optimization of planning and sscheduling problem of tower manufacturing company.
Çingi, Özden; Department of Industrial Engineering (1973)
Optimization of groundwater mangement by linear programming.
Balkaya, F Halim; Department of Civil Engineering (1982)
Optimization of reservoir operation using value iteration method.
Calapover, Meral H; Department of Civil Engineering (1975)
Optimization of conditions of metallothermic reduction of rare earth preconcenrtrates
Yılmaz, Serkan; Topkaya, Yavuz Ali; Department of Metallurgical and Materials Engineering (2007)
Rare earth ferrosilicon alloy is an important additive for ferrous metallurgy. It is mainly used to control the detrimental effects of sulfur in steel and to modify graphite structures in cast iron. The aim of this study was to optimize the conditions for the production of rare earth ferrosilicon alloy by metallothermic reduction process using a preconcentrate prepared from a bastnasite type of ore present in the Beylikahır-Eskişehir region of Turkey. In this study, the rare earth preconcentrate was reduced...
Citation Formats
A. Ferahli, “Optimization of Aslantas water resources project by a modified benef-cost criterion.,” Middle East Technical University, 1980.