Optimization of planning and sscheduling problem of tower manufacturing company.

1973
Çingi, Özden

Suggestions

Optimization of hydroelectric power production of Sariyar and Gokcekaya reservoirs by dynamic programming.
Aygün, Ercan; Department of Civil Engineering (1978)
Optimization of energy-economy interaction for Turkey by means of two mathematical models.
Karan, Mehmet Hilmi; Department of Operations Research (1986)
Optimization of Aslantas water resources project by a modified benef-cost criterion.
Ferahli, Abdulkadir; Department of Civil Engineering (1980)
Optimization of transmission network for homogeneous good market
Vasin, A.; Gao, H.; Dolmatova, M.; Weber, Gerhard Wilhelm (Informa UK Limited, 2017-01-01)
We examine a model of a perfect competitive homogeneous good market with a network structure. Such a structure is typically important for energy resources: natural gas, oil and electricity. Local markets are connected by transmission lines with limited capacities and given cost functions for capacity increments. We consider the total welfare optimization problem and provide a method that determines optimal investments in the transmission system expansion for some types of the networks. In particular, we stu...
OPTIMIZATION OF PRODUCTION PARAMETERS OF ADI FOR INDUSTRY APPLİCATİONS
Kalkanlı, Ali(2013-12-31)
OPTIMIZATION OF PRODUCTION PARAMETERS OF ADI FOR INDUSTRY APPLİCATİONS
Citation Formats
Ö. Çingi, “Optimization of planning and sscheduling problem of tower manufacturing company.,” Middle East Technical University, 1973.