Capacity scheduling and production planning of a new copper smelting system at Rize-Çayeli-Madenköy

1976
Turfanda, Orhan

Suggestions

Capacity analysis in a serial production line
Baygın, Özlem; Erkip, Nesim; Department of Industrial Engineering (1993)
Capacity expansion for semek swithcgear manufacturing system.
Yıldız, Aliye; Department of Electrical Engineering (1986)
Capacity evaluation of damaged and repaired structures
Gür, Türel; Sucuoğlu, Haluk; Department of Civil Engineering (1999)
Capacity planning and range setting quantity flexibility contracts as a manufacturer
Pesen, Şafak; Kayalıgil, Sinan; Department of Industrial Engineering (2003)
Quantity Flexibility contract is an arrangement where parties agree upon a scheme of forming ranges on volumes for their future transactions. The contract is based on setting upper and lower limits on replenishment orders as simple multiples of point estimates updated, published and committed by the buyers. We introduce a manufacturer with a limited capacity; also capable of subcontracting, for deliveries with a known lead time. He offers a Quantity Flexibility (QF) contract to a buyer while he has an activ...
Capacity allocation problem in flexible manufacturing systems: branch and bound based approaches
ÖZPEYNİRCİ, SELİN; Azizoğlu, Meral (Informa UK Limited, 2009-01-01)
This study considers an operation assignment and capacity allocation problem that arises in flexible manufacturing systems. The machines have limited time and tool magazine capacities and the available tools are limited. Our objective is to maximise total weight of assigned operations. We develop a branch and bound algorithm that finds the optimal solutions and a beam search algorithm that finds high quality solutions in polynomial time.
Citation Formats
O. Turfanda, “Capacity scheduling and production planning of a new copper smelting system at Rize-Çayeli-Madenköy,” Middle East Technical University, 1976.