Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Capacity expansion for semek swithcgear manufacturing system.
Date
1986
Author
Yıldız, Aliye
Metadata
Show full item record
Item Usage Stats
112
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/6299
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
Capacity scheduling and production planning of a new copper smelting system at Rize-Çayeli-Madenköy
Turfanda, Orhan; Department of Industrial Engineering (1976)
Capacity analysis in a serial production line
Baygın, Özlem; Erkip, Nesim; Department of Industrial Engineering (1993)
Capacity determination of pumped storage projects using market electricity prices
Çetinkaya, Semih; Tiğrek, Şahnaz; Department of Civil Engineering (2014)
Renewable and clean energy is gaining more importance after the nuclear disasters with increasing awareness of depletion of fossil fuels, concerns about the global warming and increasing energy demand. However, intermittency of renewable resources is the biggest challenge in the restructuring world energy market. Energy has to be stored against sudden changes in the production and consumption. In order to keep the continuity of the energy supply, pumped storage can be a remedy. Therefore, pumped storage pro...
Capacity planning and range setting quantity flexibility contracts as a manufacturer
Pesen, Şafak; Kayalıgil, Sinan; Department of Industrial Engineering (2003)
Quantity Flexibility contract is an arrangement where parties agree upon a scheme of forming ranges on volumes for their future transactions. The contract is based on setting upper and lower limits on replenishment orders as simple multiples of point estimates updated, published and committed by the buyers. We introduce a manufacturer with a limited capacity; also capable of subcontracting, for deliveries with a known lead time. He offers a Quantity Flexibility (QF) contract to a buyer while he has an activ...
Capacity allocation problem in flexible manufacturing systems: branch and bound based approaches
ÖZPEYNİRCİ, SELİN; Azizoğlu, Meral (Informa UK Limited, 2009-01-01)
This study considers an operation assignment and capacity allocation problem that arises in flexible manufacturing systems. The machines have limited time and tool magazine capacities and the available tools are limited. Our objective is to maximise total weight of assigned operations. We develop a branch and bound algorithm that finds the optimal solutions and a beam search algorithm that finds high quality solutions in polynomial time.
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
A. Yıldız, “Capacity expansion for semek swithcgear manufacturing system.,” Middle East Technical University, 1986.