Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
A mixed integer programming method for multi-project resource leveling
Date
2020-06-01
Author
Altun, Murat
Sönmez, Rifat
Akçamete Güngör, Aslı
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
330
views
0
downloads
Cite This
In the implementation of construction projects, efficient resource planning plays a prominent role in developing cost-efficient solutions. Therefore, the decision makers should level the project resources with respect to the planned project schedule to reduce the project costs. In general, they usually focus on each project separately to optimize the project’s resource usage according to the intended resource objective function of the resource leveling problem. However, in real life, multiple projects with shared resources may be executed simultaneously. Hence, separate evaluations of resource leveling problem for each project may result in sub-optimal solutions due to negligence of the effects of the shared resources for the projects. Therefore, the projects using shared resources should be leveled together to reach the global optimum solution. In this study, an optimization model is developed using Mixed Integer Programming (MIP) to minimize peak requirements of different resource types in multiple construction projects. The performance of the proposed model is tested with four case study projects with different project settings. The solutions that are achieved with the proposed method are compared with the optimum solutions of the traditional leveling models which optimize the resource usage for each project separately. The results show that the proposed method considerably improves portfolio performance compared to the results of the traditional method based on separate leveling of projects.
URI
https://hdl.handle.net/11511/57826
Journal
Journal of Construction Engineering, Management & Innovation
DOI
https://doi.org/10.31462/jcemi.2020.02131140
Collections
Department of Civil Engineering, Article
Suggestions
OpenMETU
Core
A Hybrid building extraction algorithm based on multilevel segmentation and boundary simplification
Yarkınoğlu Gücük, Oya; Düzgün, H. Şebnem; Department of Geodetic and Geographical Information Technologies (2017)
Building footprints have an important role in urban planning, infrastructure development, climate studies and disaster management. The precise knowledge of buildings serves as a primary source for interpreting complex urban characteristics and also helps decision makers with more realistic urban management. In this thesis, the building boundary extraction including a hybrid approach is proposed. Firstly, normalized Digital Surface Model (nDSM) of the study area is generated from aerial Light Detection and R...
A Mixed integer programming method for integrated discrete time-cost trade-off and manpower resource leveling problem
Tatar, Ali Can; Sönmez, Rifat; Atan, S. Tankut; Department of Civil Engineering (2016)
Construction projects have to meet all of the objectives of scope, quality, schedule, budget simultaneously. These objectives, however, cannot be considered as independent of each other. For example, an increase in direct resources will usually lead to shorter activity durations. A shorter project duration results in lower indirect costs, whereas the additional resources cause an increase the project’s direct costs, in general. This phenomenon is defined as time-cost trade-off problem (TCTP). Nevertheless, ...
An Integrated regression-bootstrap sampling scheduling method for probabilistic duration range estimation of construction projects
Barış, Özgür; Sönmez, Rifat; Department of Civil Engineering (2019)
The estimation of project duration is important in construction projects, since it directly affects the costs and the success of the projects. Schedule risks can be determined along with the duration estimations in order to assess the possibility of delay penalties and additional costs. Therefore, the accuracy of the estimation of project duration range is very crucial in construction industry to assess the schedule risks. This thesis presents an integrated approach of non-parametric bootstrap sampling meth...
A Mixed integer programming method for pareto front optimization of discrete time cost trade-off problem
Bilir, Mert; Sönmez, Rifat; Atan, S. Tankut; Department of Civil Engineering (2015)
There is a reverse relationship between the activity durations and costs in construction projects. In scheduling of construction projects, the project duration can be compressed (crashed) by expediting some of its activities in several ways including; increasing crew size, working overtime, or using alternative construction methods. As a result, when duration of a critical activity is decreased, its cost increases and project duration decreases. In construction projects, resources are usually available in d...
A GPS/GIS based line of balance method for planning and control of construction projects
Uysal, Furkan; Sönmez, Rifat; Department of Civil Engineering (2007)
In construction industry Gantt charts, network methods and Line of Balance (LOB) methods are generally used for planning and control of projects. Networking techniques such as Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) require technical knowledge and could be difficult to implement without proper scheduling background. Gantt charts and LOB techniques are usually easier to implement, however, similar to network techniques these techniques lack visualization. A graphical bas...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
M. Altun, R. Sönmez, and A. Akçamete Güngör, “A mixed integer programming method for multi-project resource leveling,”
Journal of Construction Engineering, Management & Innovation
, pp. 131–140, 2020, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/57826.