Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Automated Generation of Customized Field Data Collection Templates to Support Information Needs of Cost Estimators
Date
2010-03-01
Author
Kiziltas, Semiha
Akinci, Burcu
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
171
views
0
downloads
Cite This
While estimating activity production rates, cost estimators rely on historical production rates. To have realistic and useful cost estimates based on historical production rates, such production rate data should be augmented with historical contextual information that depict conditions under which activity production rates were achieved in past projects. This information is needed in determining which production rate to use among alternates for a similar activity existing in a new bid. Estimators need contextual information especially when they are unfamiliar with the work being estimated. Hence, such information items need to be identified, collected, and stored for estimators' use in new projects. This paper details a construction-method specific and an extensible approach that is developed for enabling cost estimators to define contextual information items that need to be collected on job sites and stored as part of project histories. Based on this approach, the writers implemented a prototype system, called as ContextGen, and performed user-tests with estimators with different experience levels. Results showed that the developed approach captures method-specific information needs of estimators and is extensible to incorporate new contextual information items that can have different data representations. The developed approach is also precise in retrieving contextual information items specific to a construction method from a set of predefined contextual information items available in a library.
Subject Keywords
Civil and Structural Engineering
,
Computer Science Applications
URI
https://hdl.handle.net/11511/65597
Journal
JOURNAL OF COMPUTING IN CIVIL ENGINEERING
DOI
https://doi.org/10.1061/(asce)cp.1943-5487.0000017
Collections
Department of Civil Engineering, Article
Suggestions
OpenMETU
Core
Comparison of experienced and novice cost estimator behaviors in information pull and push methods
Kiziltas, Semiha; Akinci, Burcu; Gonzalez, Cleotilde (Canadian Science Publishing, 2010-02-01)
Construction cost estimators mainly use analogy-based decision-making processes while estimating activity production rates in new bids They need to search information items that will help them in understanding the differences and similarities between the current and previously Completed projects to select appropriate production rates and make necessary adjustments to the selected production rates. The objective of the study is to understand the effect of information pull-push methods on the behaviors of cos...
Parallel Hybrid Genetic Algorithm and GIS-Based Optimization for Municipal Solid Waste Collection Routing
Düzgün, H. Şebnem; Uşkay, S. Onur; Aksoy, Ayşegül (American Society of Civil Engineers (ASCE), 2016-01-01)
A vast majority of studies on municipal solid waste (MSW) collection routing do not consider the constraints pertinent to actual road networks such as unidirectional roads and terrain characteristics. As a result, good practices such as the avoidance of U-turns cannot be used. This study introduces geographic information system (GIS)-integrated software (RouteSW) for the optimization of MSW collection routes by considering path constraints. The software uses a parallelized hybrid genetic algorithm (PHGA) to...
Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects
Fidan, Gulsah; Dikmen Toker, İrem; Tanyer, Ali Murat; Birgönül, Mustafa Talat (American Society of Civil Engineers (ASCE), 2011-07-01)
Risk management is about identifying risks, assessing their impacts, and developing mitigation strategies to ensure project success. The difference between the expected and actual project outcomes is usually attributed to risk events and how they are managed throughout the project. Although there are several reference frameworks that explain how risks can be managed in construction projects, a major bottleneck is the lack of a common vocabulary for risk-related concepts. Poor definition of risk and patterns...
Building-Information-Modeling-Based Earthquake Damage Assessment for Reinforced Concrete Walls
Anil, Engin Burak; Akinci, Burcu; Kurç, Özgür; Garrett, James H. (American Society of Civil Engineers (ASCE), 2016-07-01)
Engineering analysis to quantify the effects of earthquake forces on the structural strength of components requires determining the damage mode and severity of the components. The analysis requires strength computations and visual damage assessments, which are information intensive, potentially error-prone, and slow. This study develops a building-information-modeling (BIM) based approach to support the engineering analysis of reinforced concrete structures. In the proposed approach, the damage information ...
Risk assessment of international construction projects using the analytic network process
Bu-Qammaz, Amani Suliman; Dikmen Toker, İrem; Birgönül, Mustafa Talat (Canadian Science Publishing, 2009-07-01)
In this study, an analytic network process (ANP), which can handle the interrelations between risk related factors, is proposed as a reliable technique for measuring the level of risk associated with international construction projects. Within this context, ANP is used to derive the relative priorities of risk factors as an input to a decision support tool, which can be utilized during bidding decisions. The decision support tool may help a decision maker to estimate the level of risk so that alternative pr...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
S. Kiziltas and B. Akinci, “Automated Generation of Customized Field Data Collection Templates to Support Information Needs of Cost Estimators,”
JOURNAL OF COMPUTING IN CIVIL ENGINEERING
, pp. 129–139, 2010, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/65597.