Comparison of Team Performance Measures for Global Software Development Learners

2009-07-16
Swigger, Kathleen
Serçe, Fatma Cemile
Alpaslan, Ferda Nur
Brazile, Robert
Dafoulas, Georges
Cabrera, Victor Lopez

Suggestions

Comparison of cost performance for three aggregate production planning models in a manufacturing firm.
Tarakçioğlu, A Arif; Department of Operations Research (1981)
Comparison of lead time quotation policies in e-commerce environment
Altuntaş, Ecem; Duran, Serhan; Department of Industrial Engineering (2019)
This research is based on problems faced by e-commerce firms while determining lead time for their customers. It is hard to obtain an optimal policy for the tradeoff between serving on-time and quoting short lead times. On-time customer services are positively correlated with rating scores of firms in e-commerce websites. Therefore, in this study, the fluctuation of on-time customer service proportion is used as the main determinant of the rating of the firms and different policies of lead time quotation ar...
Comparison of domain-independent and domain-specific location predictors with campus-wide Wi-Fi mobility data
Karakoç, Mücahit; Coşar, Ahmet; Bayır, Murat Ali; Department of Computer Engineering (2010)
In mobile computing systems, predicting the next location of a mobile wireless user has gained interest over the past decade. Location prediction may have a wide-range of application areas such as network load balancing, advertising and web page prefetching. In the literature, there exist many location predictors which are divided into two main classes: domain-independent and domain-specific. Song et al. compare the prediction accuracy of the domain-independent predictors from four major families, namely, M...
Comparison of Functional Size Based Estimation and Story Points, Based on Effort Estimation Effectiveness in SCRUM Projects
Ungan, Erdir; Cizmeli, Numan; Demirörs, Onur (2014-08-29)
In this study, we compared the effectiveness of two approaches to effort estimation for organizations utilizing SCRUM. We compared SCRUM's native effort estimation method Story Points and poker planning, with effort estimation models based on COSMIC Function Points (CFP) for a selection of projects. We utilized different regression models and ANN methodology to develop estimation model from the backlog stories. Results indicated that, estimation model built with COSMIC measurement results prove to be a bett...
Comparison of BEST and LEED green building rating systems through cost based optimization
Uğurlu, Bengisu; Aksoy, Ayşegül; Department of Environmental Engineering (2020-1-25)
Buildings have significant effects on climate change due to vast resource consumption and pollution generation. Improving the effective use of limited resources and constructing environmentally friendly buildings are important in the realm of mitigations for climate change. Several countries have their green building rating systems tailored towards their regulations, distinctive climatic conditions, unique cultures and traditions, diverse building types and ages, or wide-ranging environmental, economic, and...
Citation Formats
K. Swigger, F. C. Serçe, F. N. Alpaslan, R. Brazile, G. Dafoulas, and V. L. Cabrera, “Comparison of Team Performance Measures for Global Software Development Learners,” 2009, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/78074.