Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Project Development Levels and Team Characteristics in Design Education
Date
2015-08-10
Author
Börekçi, Naz Ayşe Güzide Z.
Metadata
Show full item record
Item Usage Stats
120
views
0
downloads
Cite This
URI
http://www.design-ed.org/conferences/learn-x-design-2015-conference/
https://hdl.handle.net/11511/79809
Collections
Unverified, Conference / Seminar
Suggestions
OpenMETU
Core
Project Portfolio Management Software Use in Construction Industry
Demirçeken, Orçun; Keskin, Başak; Sönmez, Rifat (2016-06-25)
In recent years, a variety of software alternatives and capabilities have been made available for project and portfolio management (PPM). However, very little research has focused on the use of project and portfolio management software in the construction industry. Degree of adoption of PPM software and the reasoning behind these selections may vary among contractors, as each project’s unique situation may have an impact on the contractor’s decision. The objective of this research is to determine the curren...
Project scheduling with discounted cash flows and progress payments
Kazaz, Burak; Sepil, Canan; Department of Industrial Engineering (1993)
Project appraisal and selection using the analytic network process
Dikmen Toker, İrem; Birgönül, Mustafa Talat (Canadian Science Publishing, 2007-07-01)
Where prioritization and selection process of large-scale construction projects is concerned, governments should consider various quantitative and qualitative criteria when choosing the best project alternative. The traditional benefit-cost (B/C) analysis has some drawbacks in terms of analyzing qualitative attributes that cannot be easily expressed in monetary terms. To eliminate this limitation, multicriteria decision-making techniques are proposed for the solution of project prioritization problems. In t...
Project Selection in Design Studio Absence of Learning Environments
Basa, İnci (Informa UK Limited, 2010-01-01)
Project selection is an essential matter of design teaching. Based on observations of a specifi c curriculum, the author claims that a wide repertoire of subjects including offi ces, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/schools" are similarly ignored. Considering this, the study unfolds reasons why interior design studios do not assign "learning environments" as design projects. Moreover, it analyzes a specifi c l...
Project scheduling with discounted cash flows under resource restrictions
Özdemir, Ahmet; Sepil, Canan; Department of Industrial Engineering (1995)
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
N. A. G. Z. Börekçi, “Project Development Levels and Team Characteristics in Design Education,” 2015, vol. 1, Accessed: 00, 2021. [Online]. Available: http://www.design-ed.org/conferences/learn-x-design-2015-conference/.