Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Causal mapping to explore emergence of construction disputes
Download
Causal-mapping-to-explore-emergence-of-construction-disputesJournal-of-Civil-Engineering-and-Management.pdf
Date
2021-05-24
Author
Tanriverdi, Cenk
Atasoy Özcan, Güzide
Dikmen Toker, İrem
Birgönül, Mustafa Talat
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
205
views
79
downloads
Cite This
Disputes, frequently encountered in construction projects, can substantially affect project success, necessitating a clear understanding of how and why disputes occur. Previous studies on disputes mostly yielded exhaustive lists or hierarchies of possible causes of disputes, which can hardly be used to understand how these causes come together to form a dispute. To address this gap, this study provides an alternative approach to understand the underlying causes of disputes, and their relationship within a specific context, using causal map analysis. This study is conducted using causal mapping approach to understand dispute emergence patterns in practice. Initially, a causal map of construction disputes is developed based on literature. The map is altered and verified through an expert workshop, considering projects contracted through FIDIC Yellow Book. The causal representation of the dispute emergence patterns highlights the importance of pre-construction studies, people factor, and contract terms. It is revealed that significant causes are either result of a chain of preceding factors or are triggers for further ones. This finding reinforces that the occurrence of disputes does not only depend on individual causes; rather, these causes combine with a series of other factors for a dispute to occur.
Subject Keywords
Construction industry
,
Dispute
,
Causal map
,
Contract management
,
FIDIC
,
Workshop
URI
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85106926124&origin=inward
https://hdl.handle.net/11511/91145
Journal
Journal of Civil Engineering and Management
DOI
https://doi.org/10.3846/jcem.2021.14900
Collections
Department of Civil Engineering, Article
Suggestions
OpenMETU
Core
A Causal mapping approach for the analysis of construction disputes
Tanrıverdi, Cenk; Dikmen Toker, İrem; Department of Civil Engineering (2019)
Containing various work disciplines, numerous stakeholders, and relatively extensive procedures due to its nature, disputes are frequently encountered in construction projects. The fact that disputes can have devastating effects on success of projects in terms of both time and cost to both parties involved when not dealt with care, makes a clear understanding of how and why disputes occur in construction projects an important research topic. Previous studies on this subject has mostly yielded only exhaustiv...
Case-based reasoning model for the management of design related changes in design-build construction projects
Özgüneş, Aydın; Tanyer, Ali Murat; Department of Building Science in Architecture (2016)
Project changes constitutes to an important problem in construction projects which are unavoidable and may appear at any stage of the construction. Most of the time, project changes cause conflicts between the parties and end with change orders or claims that lead to time and money losses. Moreover, design related changes, which can be defined as variations related with the design process of the construction project, are referred as one of the most frequently seen project change types in construction projec...
A Multi agent risk analysis and sharing platform for international construction projects
Dağkıran, Gülşah; Dikmen Toker, İrem; Tanyer, Ali Murat; Department of Civil Engineering (2015)
The risks and complexities that are naturally inherent with construction projects and the diverging interests of the parties involved, cause deviations from the project objectives and make claims an unavoidable consequence in construction projects. Risk management is accepted as one of the critical success factors to handle the claim management process effectively. In construction management literature, while there are several studies to develop a mechanism for risk management, decision making and dispute r...
Development of a lessons learned management process model and a web-based tool for construction companies
Eken, Görkem; Birgönül, Mustafa Talat; Dikmen Toker, İrem; Department of Civil Engineering (2017)
Organizational memory formation and its effective utilization is a source of competitive advantage especially in project-based industries such as construction industry as it may eliminate potential problems in projects leading to higher profitability and less errors. However, project-based nature also poses challenges for establishing organizational memory as it is hard to capture knowledge of temporary project teams and transfer different types of knowledge between projects. This study presents a “Lessons ...
Comparing Performances of Machine Learning Techniques to Forecast Dispute Resolutions
AYHAN, MURAT; Dikmen Toker, İrem; Birgönül, Mustafa Talat (2022-9-01)
This paper compares classification performances of machine learning (ML) techniques for forecasting dispute resolutions in construction projects, thereby mitigating the impacts of potential disputes Findings revealed that resolution cost and duration, contractor type, dispute source, and occurrence of changes were the most influential factors on dispute resolution method (DRM) preferences. The promising accuracy of the majority voting classifier (89.44%) indicates that the proposed model can provide decisio...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
C. Tanriverdi, G. Atasoy Özcan, İ. Dikmen Toker, and M. T. Birgönül, “Causal mapping to explore emergence of construction disputes,”
Journal of Civil Engineering and Management
, pp. 288–302, 2021, Accessed: 00, 2021. [Online]. Available: https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85106926124&origin=inward.