THE EFFECT OF PROJECT MANAGEMENT OFFICE ON ORGANIZATIONAL LEARNING: A CASE FROM THE DEFENSE INDUSTRY IN TURKEY
Ulutaş, Başak; Pamukcu, Mehmet Teoman; Department of Science and Technology Policy Studies (2022-12)
A project management office is an organizational structure and one of the main contributors to organizational learning. This thesis aims to figure out the effect of a project management office on organizational learning by analyzing the case of a Turkish defense industry company. The thesis is based on the hypothesis that project management office structure has direct and indirect effects on organizational learning. Therefore, before an in-depth literature analysis on organizational learning and project man...
Proje yaklaşımı
Demirci, Zeliha (Hedef Yayıncılık, 2021-01-01)
THE EFFECT OF TECHNOLOGY CONVERGENCE ON CROSS-SECTORAL CO-EVOLUTION: THE CASE OF AUTOMOTIVE & ICT SECTORS
Saraçoğlu, Duygu; Akçomak, İbrahim Semih; Department of Science and Technology Policy Studies (2021-7-7)
Recent developments show that convergence, particularly technology convergence, is one of the main trends that shape the new economy. Such that, the dominant sector is being created by more than one converging sector that, in turn, provides the infrastructure for wealth and innovation creation by all sectors. Thus, convergence is becoming the basis of all sectors and it reduces the threshold of transforming the economy. Moreover, recent studies suggest that key enabling technologies (KETs) that have d...
The Resource allocation capabilities of commercial construction project management software for the resource leveling problem /
Rezvan Khah, Emad; Sönmez, Rifat; Atan, S. Tankut; Department of Civil Engineering (2014)
Critical path method (CPM) has been commonly used for scheduling of construction projects. However, CPM only considers the relations between the activities, but does not optimize the resource allocation. Resource leveling problem (RLP) concentrates on optimizing resource utilization histograms obtained by Critical Path Method (CPM) without changing the project duration. Resource leveling is crucial for effective use of construction resources particularly, manpower and machinery resources to minimize the pro...
Projelerin Değerlendirilmesinde Risk Analizi Yaklaşımı
Birgönül, Mustafa Talat; Dikmen Toker, İrem (null; 1996-10-19)