Estimation of expected monetary values of selected Turkish oil fields using two different risk assessment methods

Download
2004
Kaya, Egemen
Most investments in the oil and gas industry involve considerable risk with a wide range of potential outcomes for a particular project. However, many economic evaluations are based on the أmost likelyؤ results of variables that could be expected without sufficient consideration given to other possible outcomes and it is well known that initial estimates of all these variables have uncertainty. The data is usually obtained during drilling of the initial oil well and the sources are geophysical (seismic surveys) for formation depths and areal extent of the reservoir trap, well logs for formation tops and bottoms, formation porosity, water saturation and possible permeable strata, core analysis for porosity and saturation data and DST (Drill-Stem Test) for possible oil production rates and samples for PVT (Pressure Volume Temperature) analysis to obtain FVF (Formation Volume Factor) and others. The question is how certain are the values of these variables and what is the probability of these values to occur in the reservoir to evaluate the possible risks. One of the most highly appreciable applications of the risk assessment is the estimation of volumetric reserves of hydrocarbon reservoirs. Monte Carlo and moment technique consider entire ranges of the variables of Original Oil in Place (OOIP) formula rather than deterministic figures. In the present work, predictions were made about how statistical distribution and descriptive statistics of porosity, thickness, area, water saturation, recovery factor, and oil formation volume factor affect the simulated OOIP values. The current work presents the case of two different oil fields in Turkey. It was found that both techniques produce similar results for 95%. The difference between estimated values increases as the percentages decrease from 50% and 5% probability.

Suggestions

Monte Carlo simulation of oil fields
Kök, Mustafa Verşan; Akın, Serhat (Informa UK Limited, 2006-07-01)
Most investments in the oil and gas industry involve considerable risk with a wide range of potential outcomes for a particular project. However, many economic evaluations are based on the "most likely" results of variables that could be expected without sufficient consideration given to other possible outcomes, and it is well known that initial estimates of all these variables have uncertainty. The data is usually obtained during drilling of the initial oil well, and the sources are geophysical ( seismic s...
Assessment of reservoir rock and fluid data for Black Oil Simulation – a case study
Susuz, Onur; Parlaktuna, Mahmut; Department of Petroleum and Natural Gas Engineering (2009)
Reservoir simulation studies are one of the key tools in an integrated reservoir management study. A successful reservoir simulation application requires representative input data for reservoir rock and fluid properties. This study aims to develop a road map from laboratory measurements to the input data file of reservoir simulation and to make a probabilistic approach for the estimation of unknown parameters. Raw data of reservoir rock and fluid properties of a selected oil field of Turkey will be interpre...
Estimation of expected monetary values of selected oil fields
Kök, Mustafa Verşan; Akın, Serhat (Informa UK Limited, 2006-07-01)
As there is uncertainty in estimates of capital, reserves, and net present value in the petroleum industry; risk analysis is the key point for an oil company. It is easy to make decisions after quantifying the uncertainty with ranges of possible values and associated probabilities. Instead of deterministic models, probabilistic evaluations give a wide range of outcomes for decision making. Monte Carlo Simulation is a tool that presents different scenarios and yields probability and value relationships in re...
Identification and modeling of critical success factors of portfolio management in construction sector
Hızal, A. Sercenk; Sönmez, Rifat; Department of Civil Engineering (2019)
Project Portfolio Management (PPM) is a good theoretical fit for a multi-dimensional industry like construction, however practical implications are limited. The aim of this thesis is to deeply analyze and investigate the determinant factors on the success of portfolio management in the construction industry. Since few studies have addressed them, both PPM in the construction sector and related success factors could be regarded as newly arising subjects for the literature. Consequently, the main contribution...
Effects of fly ash and desulphogypsum on the geotechnical properties of çayırhan soil
Baytar, Ali Özgür; Çokça, Erdal; Department of Civil Engineering (2005)
Collapse in soils occur when a partially unstable, partially saturated open fabric under high enough stress causing a metastable structure with large soil suction, or in the presence of a bonding or cementing agent, is allowed to free access to additional water. Such excess water reduces soil suction and weakens or destroys the bonding, this causing shear failure at the interaggregate or intergranular contacts, consequently, the soil collapses. In this study, the collapsible soils found in the Çayirhan Ther...
Citation Formats
E. Kaya, “Estimation of expected monetary values of selected Turkish oil fields using two different risk assessment methods,” M.S. - Master of Science, Middle East Technical University, 2004.