Using Monte Carlo simulation and multi-agent systems to estimate financial feasibility of hepp projects tendered on a bot basis: a case study from Turkey

Download
2014
Akçay, Emre Caner
As a fast growing country, Turkey’s energy demand has been increasing every year and new investments are needed in the renewable energy sector. Turkish government uses the Build-Operate-Transfer (BOT) model to realize urgent investments in the hydroelectric energy sector. Given the government’s purchase guarantee of the generated electricity, hydroelectric power plant (HEPP) projects can be feasible options for investors. However, during the feasibility studies, risk factors stemming from the macro environment as well as project level risks should be considered. The objective of this thesis is to develop a methodology that can be used to predict the profitability of HEPP considering the risk factors. During the initial parts of this study, a checklist of risk factors has been prepared and Monte Carlo Simulation was proposed for risk analysis. However, another factor which is the “negotiation” between the broker and energy producer is important while estimating the energy price levels to be used during Monte Carlo Simulation. A Multi-Agent System (MAS) is proposed to be used in combination with the Monte Carlo Simulation for better estimation of energy prices and thus, profitability of an investment. Hence, in this thesis, a methodology to combine the risk assessment and negotiation process while determining the financial feasibility of HEPP projects is proposed. The methodology is tested on a real project. Expert judgement is used to compare the results of deterministic analysis, Monte Carlo Simulation and MAS integrated with Monte Carlo Simulation. Experts believe that MAS-enabled Monte Carlo Simulation gives more reliable results than the other two techniques. As a final remark, the results of the case study cannot be generalized, however the methodology offered in this thesis may be used for HEPP projects tendered on a BOT basis to predict financial feasibility considering risks and dynamics of the negotiation process.

Suggestions

Development of the rule curve for Altıparmak hydroelectric power plant
Boyacıoğlu, Şerife Ece; Kentel Erdoğan, Elçin; Yanmaz, Ali Melih; Department of Civil Engineering (2013)
Energy requirement of Turkey increases day by day and hydropower is currently the main renewable energy source of the country. Thus, planning the development of the unused hydropower potential of Turkey is critical. Available water resources have to be developed and managed in a wise manner. Reservoir operation rule curves are fundamental guidelines for long term reservoir operation. Rule curve which results in the maximum energy generation has to be developed for each hydropower plant (HEPP). The goal of t...
Optimisation of the Tigris river hydropower system operations
Yalçın, Emrah; Tiğrek, Şahnaz; Department of Civil Engineering (2015)
Growing external energy dependence and rising oil prices are encouraging Turkey to turn to renewable energy, especially hydropower. The amended legislation on the transference of the operational rights of existing, under-construction and planned hydropower plants to the private sector and the allocation of water right licenses to develop new projects for electricity production has led to a drastic decrease of the public share in production. Consequently, conflicts related to the operation of reservoirs have...
Improved wind power forecasting using combination methods
Köksoy, Ceyda Er; Birtürk, Ayşe Nur; Karagöz, Pınar; Department of Computer Engineering (2015)
Wind is an important renewable energy source to produce electricity thanks to its reliable, omnipresent and economically feasible characteristics and it has a growing proportion in overall energy production worldwide. However, integration of the generated wind power into the existing transmission grid is an issue due to inherently volatile and intermittent behavior of wind. Moreover, the power plant owners need reliable information about day-ahead power production for market operations. Therefore, wind powe...
Feasibility study of a hydropower project: case study of Niksar HEPP, Turkey
Mutlu, Reyhan; Kentel Erdoğan, Elçin; Altınbilek, Doğan H.; Department of Civil Engineering (2010)
Hydropower helps countries meet their energy needs in an economically, environmentally, and socially sustainable way while saving money and increasing energy security and self-reliance. Being one of the fastest developing countries, electricity demand of Turkey has been increasing and is expected to increase in the future. Untapped hydropower potential is among the prospective alternative resources to supply this demand. Developing a hydropower project requires a great deal of expertise in multiple discipli...
Effects of numerical weather predictions on wind power forecasts
Işık Çetin, İrem; Yücel, İsmail; Sarı, Ramazan; Department of Earth System Science (2018)
Wind energy investments are rapidly increasing in Turkey. The prediction of the electrical power generated from the wind is also gaining importance in this field because of the complexity of meteorological parameter wind. In this context, Wind Energy Monitoring and Forecasting Center (RITM) project has been initiated within the scope of the General Directorate of Renewable Energy (YEGM), in 2010. The final hourly wind energy predictions are generated by using the combination of the production data from Wind...
Citation Formats
E. C. Akçay, “Using Monte Carlo simulation and multi-agent systems to estimate financial feasibility of hepp projects tendered on a bot basis: a case study from Turkey,” Ph.D. - Doctoral Program, Middle East Technical University, 2014.