Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
A Method for Facilitating 4D Modeling by Automating Task Information Generation and Mapping
Date
2018-10-04
Author
Altun, Murat
Akçamete Güngör, Aslı
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
259
views
0
downloads
Cite This
4D modeling integrates 3D model with project time schedule to provide virtual simulation for identifying spatio-temporal problems earlier in construction projects. However, constructing a 4D model takes a significant amount of time and is prone to man-made errors due to its manual steps and repetitive nature. Therefore, in this study, a model based two-phase method is developed to facilitate linking 3D model with the schedule by automating the cumbersome steps. In the first phase, 4D Task IDs are created and assigned automatically to the model elements using a pattern that depends on their properties. In the second phase, using these IDs, the method generates a task ID list for scheduling and the search sets for simulation in order to map the model elements with the schedule tasks automatically, according to matching IDs. Hence, using shared IDs enhances the communication between 4D modeling tools. The efficiency of the method was tested with a well-known office building model constructed in Revit. The schedule was completed in Microsoft Project and 4D simulation is performed in Navisworks. The automated steps offered by the method were coded in Dynamo add-in of Revit. The analysis result showed that the developed method generated a 4D model in a shorter time compared to the manually performed one.
Subject Keywords
Dynamo
,
Automated information generation
,
4D modeling
,
Building information modeling
URI
https://hdl.handle.net/11511/36836
DOI
https://doi.org/10.1007/978-3-030-00220-6_57
Collections
Department of Civil Engineering, Conference / Seminar
Suggestions
OpenMETU
Core
Modeling highway projects: The need for Highway Information Modeling (HIM) guideline and information exchange
Ertaymaz, Uğurcan; Atasoy Özcan, Güzide (2019-06-01)
Building Information Modeling (BIM) is one of the latest trends in the construction sector and utilized for modeling, reviewing and analyzing building projects for the last two decades with benefits including visualization, planning, and estimation. BIM provides a well-organized and streamlined approach for building projects; however, its application for highway projects has been scarce. Progressing requirements, increasing number of stakeholders, integrated design solutions, expanding model uses and rapid ...
Analysis of modeling effort and impact of different levels of detail in building information models
Leite, Fernanda; Akçamete Güngör, Aslı; Akinci, Burcu; Atasoy Özcan, Güzide; Kiziltas, Semiha (2011-08-01)
The main objectives of this paper are to evaluate the modeling effort associated with generating building information modeling (BIM) at different levels of detail (LoD) and the impact of LoD in a project in supporting mechanical, electrical and plumbing (MEP) design coordination. Results show an increase in total modeling time ranging from doubling the modeling effort to eleven folding it, when going from one LoD to another. When comparing modeling time per object, rates ranged from 0.2 (decreased modeling ...
A digital performance assessment tool for the Dutch Government Building Agency
Gürsel Dino, İpek; Sariyildiz, Sevil; Leeuw, Rene (null; 2008-06-28)
This paper discusses the modeling efforts in the development of an integral building performance assessment tool for the Dutch Government Building Agency (RGD). The model enables the performance data to be created, processed and communicated throughout the building lifecycle by various stakeholders. The proposed model extends the authors' previous research efforts in developing a digital environment for continuous building performance verification and data integration. Moreover, it is planned to include oth...
A method for decentralized business process modeling
Türetken, Oktay; Demirörs, Onur; Department of Information Systems (2007)
This thesis study proposes a method for organizations to perform business process modeling in a decentralized and concurrent manner. The Plural method is based on the idea that organizations’ processes can be modeled by individuals actually performing the processes. Instead of having a central and devoted group of people to understand, analyze, model and improve processes, individuals are held responsible to model and improve their own processes concurrently. These individual models are then integrated to f...
A study on conceptual modeling in simulation systems : an extended methodology for KAMA
Aysolmaz Bozlu, Banu E; Demirörs, Onur; Department of Information Systems (2007)
Conceptual modeling is considered to be essential in simulation development activities. However, there are only a few research studies on how to develop conceptual models. One of the important and comprehensive approaches is the methodology developed under the leadership of METU Modeling and Simulation Center (MODSIMMER) for Turkish Armed Forces. The project suggests a methodology to develop mission space conceptual models (GUKAM), and provides a Conceptual Model Development Tool for C4ISR M&S activities, w...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
M. Altun and A. Akçamete Güngör, “A Method for Facilitating 4D Modeling by Automating Task Information Generation and Mapping,” 2018, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/36836.