A computer model for project scheduling under resourse constraints.

1987
Issa, Hisham Ali

Suggestions

A Process model for component oriented software development
Bayar, Vedat; Doğru, Ali Hikmet; Department of Computer Engineering (2001)
A two stage methodology for fleet scheduling.
Sayın (Akşar), Meral; Department of Operations Research (1984)
A mixed integer programming model for the investment planning in electric power industry.
Doğan, Kemal; Department of Industrial Engineering (1978)
A design procedure for multivariable control systems and its applications.
Sezer, Erol M; Department of Electrical Engineering (1974)
A process based model for measuring process quality attributes
Guceglioglu, AS; Demirörs, Onur (2005-01-01)
Organizations frequently use product based organizational performance models to measure the effects of information system (IS) on their organizations. This paper introduces a complementary process based approach that is founded on measuring business process quality attributes. These quality attributes are defined on the basis of ISO/IEC 9126 Software Product Quality Model. The new process quality attributes are applied in an experiment and results are discussed in the paper.
Citation Formats
H. A. Issa, “A computer model for project scheduling under resourse constraints.,” Middle East Technical University, 1987.