Analysis of existing building stock according to mitigation plan objectives

Download
2010
Hasdemir, Berna
Earthquakes in Turkey, among all natural disasters claim the highest losses in terms of human lives, material and economic assets. Most of the lives are lost within the collapsed buildings, and most of the material and economic losses are again directly related to the functional capacities of the building stock. The method of risk assessment in the existing building stock is therefore an essential step in the maintenance of safer urban environments. Analysis of risks in the building stock is usually claimed to demand surveys of engineering studies. Yet risk determination studies by planners could prove not only a more comprehensive approach, but less time consuming and cheaper. As carried out by engineers, most of safety studies in the building stock are directly related with estimating the probability of collapse and damage in individual buildings. It is necessary to recognize the need for analysis of the building stock not only in terms of structural robustness, but as part of a mitigation plan, taking into consideration all sources of hazards and the urban pattern, densities, landuse, forms of ownership, social features, management capacities, and local opportunities. Risky buildings determined by a simple set of criteria within a comprehensive planning context are comparatively explored in this study to observe the level of fit with those determined by engineering surveys. The case of Fatih District in Istanbul provides an opportunity to carry out comparative analyses. It indicates that a ‘perfect fit’ can not be achieved if for nothing but due to the disregard of multi-hazard areas, hazardous activities and other vulnerabilities like timber buildings other than reinforced concrete in the district by the engineering survey. Several trials indicated that there is a trade-off between ratio of fit and the total volume of relative vulnerability assumed. Ratios like 70% or more could make the planning approach a preferable method owing to its nature of least time-consuming and costly alternative in the determination of what constitutes risk in any urban area. Ultimate assessment could be made with the occurance of the earthquake itself.

Suggestions

Reconsidering the role civil initatives in the disaster management system of Turkey
Turhan, Ayça; Balamir, Murat; Department of City and Regional Planning (2005)
The 1999 earthquakes revealed serious gaps in the Turkish disaster management system. The lack of coordination and cooperation between governmental and non-governmental organizations, limits in the legal framework and the lack of policies and plans about disaster preparedness and mitigation are basic. It is highly relevant therefore to expose these deficiencies and find which changes are necessary for capacity building in civil initiatives and which policies can be put into practice to form a strong and a s...
Methodology and database requirements for urban regenerration action planning : the case of Zeytinburnu, İstanbul
Burnaz, Ahmet Mert; Balamir, Murat; Department of City and Regional Planning (2004)
As a result of the disregard of governments̕ direct urbanization policies for more than 50 years, most of the settlements in Turkey today demonstrate sub-standard environments and unauthorized developments subject to severe natural hazards. Turkey will have to focus in the near future on the renewal and regeneration of cities built over the past six decades, rather then sticking to urban policies solely devoted to extend new urban areas. The production of legal instruments and urban policies to facilitate t...
Preliminary seismic vulnerability assessment of existing reinforced concrete buildings in Turkey - Part I: Statistical model based on structural characteristics
Ozcebe, G; Yücemen, Mehmet Semih; Aydogan, V; Yakut, Ahmet (2003-05-13)
The 1999 earthquakes caused huge damage and economic losses in Turkey. The city of Duzce, hit by the second earthquake of Mw=7.2, suffered widespread damage to many RC buildings. Survey teams conducted post-earthquake evaluations on selected buildings that suffered various degrees of damage. The information collected was analyzed to set up a correlation between the attributes affecting seismic performance and the observed damage. A procedure, developed using a statistical method called discriminant analysis...
Urban transformation projects in Ankara: challenge for a holistic urban planning system
Karaburun, Nursun; Uzun, Cemile Nil; Department of City and Regional Planning (2009)
The global weakening of nation states has isolated cities. On the other hand, the authority of local administrations has been increasing rapidly. Urban planning responsibility is under the authority of local governments. Due to intense competition for attractive solutions, local authorities have tended to use methods that produce immediate results. Therefore, planning approach has been changing and in place of comprehensive plans, we find quick fix projects. According to comprehensive planning approach and ...
Urbanization and land-use planning in Adapazari (Turkey) reconsidered after the 1999 earthquake
Gedikli, Bahar (Springer Science and Business Media LLC, 2005-03-01)
On 17 August 1999, an earthquake with a magnitude of 7.4 struck the Eastern Marmara Region of Turkey, destroying hundreds of buildings and killing thousands of people. It is not enough to analyze the damage inflicted by the earthquake solely in terms of its physical features (magnitude, epicenter or depth). Regional policies (particularly industrialization and urbanization) and unsuitable land-use planning/engineering processes also played a role. This paper presents a critical evaluation of these factors w...
Citation Formats
B. Hasdemir, “Analysis of existing building stock according to mitigation plan objectives,” M.S. - Master of Science, Middle East Technical University, 2010.