Multi-criteria feasibility assessment of the monorail transportation system in metu campus

Download
2011
Tarighi, Amin
The overall objective of this thesis is to assess the financial, technical and social feasibility of investing in modern Automated People Movers (APM) transportation systems, generally known as monorails, in METU campus which presents a unique opportunity to fulfill the modern-day transportation needs of METU campus. This study complements the Presidency Office’s long term goal to integrate environmental, social and economic sustainability into the policies, practices and culture of the university and ultimately reduce the consumption of all resources on campus and traffic congestion and accidents. In this context, the consequent cost-benefit effects of the proposed monorail system on campus life were quantified in monetary expressions and the corresponding multi-criteria feasibility assessment including: Break-even Analysis, Cost Effectiveness Assessments and Cost Benefit Analysis have been done successfully. According to these analyses the overall capital cost of system is $46.5 million which covers the 24 months project construction period, and an additional annual operating and maintenance cost of $2 million will span the 30 year project life time. Three different scenarios were proposed for financing the project and relevant break-even points were determined for each of the scenarios. Eventually, it appears that based on the evaluations, constructing such a transit system in METU campus will be cost effective and will certainly enhance the transportation, and will contribute to the institutional improvements and environmental preservation schemes of METU campus.

Suggestions

Measurement of economic feasibility of photovoltaic power plants - application to Turkey
Karaveli, Abdullah Bugrahan; Akınoğlu, Bülent Gültekin; Soytaş, Uğur (2018-11-05)
Photovoltaic (PV) technology has reached a competitive level owing to high learning rate and technological advance. It is now a feasible technology however its feasibility varies with many parameters such as: location where PV Power Plant (PV PP) is installed, its technology, economic and social state of the country and even the unpredictable future events. In short, it depends on the cost and revenue and so the legislation, incentives, market situation, climate of the location together with solar irradiati...
Evaluation of Condition States of Bridge Elements Based on the Intensity of Different Damage Types
Akgül, Ferhat (2012-10-19)
Transportation infrastructure facilities are the essential components for the continuous development of the economics and community well-being of any country. Maintaining such facilities at all times is a difficult task for service authorities. To assist in conducting such a task, bridge management systems (BMSs) have been developed for effective asset management. This paper presents a novel technique for evaluation of condition states of elements based on the intensity of different damage types. Damages of...
Planning for a successful development of intelligent transportation systems (ITS) in Turkey
Dündar, Selim; Tüydeş Yaman, Hediye; İpekyüz, Beyhan; Karataş Sevinen, Pınar; Hüner, Egecan Emre; Evren, Güngör (2018-04-26)
Since 1990s, Intelligent Transportation Systems (ITS) has been an area of research and implementation following the rapid development in communication and computational fields of research, which has always taken advantage of advances to promote mobility, efficiency and safety in transportation systems. The last two decades ofexperience in mostly the developed countries, the accumulation of knowledge and experience on ITS enabled the discussions on how to evaluate ...
A decision support tool for feasibility assessment of hydro electrical power plant projects
Ercan, Noyan; Birgönül, Mustafa Talat; Dikmen Toker, İrem; Department of Civil Engineering (2011)
The objective of this thesis is to develop a decision support tool to assess the feasibility of a hydro electrical power plant (HEPP) investment option by estimating its profitability under various scenarios. The decision support tool may help the decision makers to understand critical parameters that affect the internal rate of return (IRR) of a HEPP investment, create realistic scenarios by assigning different values to these parameters and monitor profitability under various scenarios. The information an...
Inter-organizational coordination patterns in buyer-supplier-design agency triads in NPD projects
Akın Ateş, Melek; VAN DEN ENDE, Jan; IANNİELLO, Guido (2015-01-01)
Purpose - The purpose of this paper is to investigate inter-organizational coordination (IOC) patterns between the buying firm, design agency, and component supplier in new product development (NPD) projects and to identify the determinants of these approaches. Design/methodology/approach - Seven NPD projects are examined using the multiple-case study method. Data are collected from five design agencies, two buying firms, and two suppliers in Italy and the Netherlands. Findings - Building on organizationa...
Citation Formats
A. Tarighi, “Multi-criteria feasibility assessment of the monorail transportation system in metu campus,” M.S. - Master of Science, Middle East Technical University, 2011.