An evolutionatry approach for the single AGV routing problem

Download
2000
Tulu, Bengisu

Suggestions

An evolution operator approach for solving initial value problems
Ergenç, Tanıl; Çelebi, Okay; Demiralp, Metin; Department of Mathematics (1988)
An evolutionary approach for the target allocation problem
Erdem, E; Özdemirel, Nur Evin (Informa UK Limited, 2003-09-01)
We propose an evolutionary approach for target allocation in tactical level land combat. The purpose is to assign friendly military units to enemy units such that the total weapon effectiveness used is minimised while the attrition goals set for the enemy units are satisfied. A repair algorithm is developed to ensure feasibility with respect to the attrition goal constraints. A tightness measure is devised to determine the population size of the genetic algorithm as a function of constraint tightness. Also,...
An evolutionary approach to the simple vehicle routing problem
Demirer, Tuna; Özdemirel, Nur Evin; Department of Industrial Engineering (1995)
An interactive preference based multiobjective evolutionary algorithm for the clustering problem
Demirtaş, Kerem; Özdemirel, Nur Evin; Karasakal, Esra; Department of Industrial Engineering (2011)
We propose an interactive preference-based evolutionary algorithm for the clustering problem. The problem is highly combinatorial and referred to as NP-Hard in the literature. The goal of the problem is putting similar items in the same cluster and dissimilar items into different clusters according to a certain similarity measure, while maintaining some internal objectives such as compactness, connectivity or spatial separation. However, using one of these objectives is often not sufficient to detect differ...
An ontology-based approach for delay analysis
Bilgin, Gözde; Birgönül, Mustafa Talat; Dikmen Toker, İrem; Department of Civil Engineering (2011)
Delay is a common problem of construction sector. Recent improvements in the sector increased the competition and this led the construction projects to be more complex than before and difficult to be completed in time. This situation not only increased the delay problems, but also made the analysis of delays difficult and that caused further problems as disputes between parties to the contract. Sound knowledge in delay analysis subject is needed to enhance the solution of the delay problem in construction p...
Citation Formats
B. Tulu, “An evolutionatry approach for the single AGV routing problem,” Middle East Technical University, 2000.