Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling

2011-12-01
The major aim of this research is to demonstrate that causal relationships exist among various risk factors that necessitate identification of risk paths, rather than individual risk factors, during risk assessment of construction projects. International construction projects have more complex risk-emergence patterns because they are affected by global and foreign country conditions and project-related factors. Identification of a network of interactive risk paths, each of which initiated from diverse vulnerabilities of the project system, is considered to be a better reflection of the real conditions of construction projects than the use of generic risk checklists. In this study, using the data from 166 projects carried out by Turkish contractors in international markets and utilizing structural equation modeling (SEM) techniques, 36 interrelated risk paths were identified and the total effects of each vulnerability factor and risk path on cost overrun were assessed. SEM findings demonstrate that every risk path is initiated from a specific vulnerability factor related to project environment, and that contractor-specific vulnerabilities have the most effect on project cost overrun. Risk identification using SEM helps decision makers in answering what-if questions in the early stages of a project, tracing the effects of interdependent risks throughout the life cycle of the project and evaluating the influence of alternative mitigation strategies, not only on specific risks but also on the whole network of interrelated risk factors. DOI: 10.1061/(ASCE)CO.1943-7862.0000382. (C) 2011 American Society of Civil Engineers.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT

Suggestions

Exploring the Relationship between Complexity and Risk in Megaconstruction Projects
Erol, Huseyin; Dikmen, Irem; Atasoy Özcan, Güzide; Birgönül, Mustafa Talat (American Society of Civil Engineers (ASCE), 2020-12-01)
© 2020 American Society of Civil Engineers.Although complexity and risk are inherent characteristics of megaconstruction projects, existing project management approaches fail to incorporate complexity-based thinking into risk management. Complexity is usually considered as the source of risk events, along with uncertainty. However, prevailing risk management practices are oriented toward only handling the uncertainty. The lack of integration between the complexity and other risk-related concepts leads to un...
Fuzzy Structural Equation Model to Assess Construction Site Safety Performance
Gunduz, Murat; Birgönül, Mustafa Talat; Ozdemir, Mustafa (American Society of Civil Engineers (ASCE), 2017-04-01)
The main goal of this study is to examine the relationships between determinants of safety performance of construction sites. To achieve this goal, 168 observable variables and 16 latent dimensions that affect safety performance of construction sites were collected through extensive literature reviews, expert opinions, and face-to-face interviews. A questionnaire form was developed and administered to construction professionals as a data-collection tool about the observable variables and latent dimensions. ...
Development of Fragility Curves for Single-Column RC Italian Bridges Using Nonlinear Static Analysis
Perdomo, Camilo; Monteiro, Ricardo; Sucuoğlu, Haluk (Informa UK Limited, 2020-05-07)
The main objective of this study is to assess the accuracy and suitability of Nonlinear Static Procedures (NSPs) in the development of analytical damage fragility curves for seismic risk assessment of large portfolios of Reinforced Concrete (RC) bridges. Seven NSP approaches, from widely used single-mode conventional pushover-based approaches to the more rigorous multi-mode conventional or adaptive pushover-based procedures are implemented. By systematically comparing fragility curve estimations in terms of...
Identification of risk paths in international construction projects
Eybpoosh, Matineh; Dikmen Toker, İrem; Birgönül, Mustafa Talat; Department of Civil Engineering (2010)
Within the context of construction projects, risk is generally defined as an uncertain happening which is the function of its occurrence probability and the severity of its possible impacts on pre-defined objectives. According to this definition, international construction projects are high-risk endeavors, since they are known with their complex natures, large sizes, multidisciplinary frameworks, and unfamiliar and uncertain environments. International construction projects have more complex risk emergence ...
Web-Based Risk Assessment Tool Using Integrated Duration-Cost Influence Network Model
Dikmen Toker, İrem; Birgönül, Mustafa Talat (American Society of Civil Engineers (ASCE), 2012-09-01)
The major challenges of project risk assessment may be attributed to the knowledge requirements for determining the level of uncertainty and the development of complex models to predict project outcomes. The duration-cost influence network is an adequate model that can be used for activity-based risk modeling. In this study, a scenario analysis feature is added to this model and a Web-based tool is developed that can be used to calculate risk-adjusted duration and cost, considering the risks affecting cost ...
Citation Formats
M. Eybpoosh, İ. Dikmen Toker, and M. T. Birgönül, “Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling,” JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, pp. 1164–1175, 2011, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/46322.