Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Web-Based Risk Assessment Tool Using Integrated Duration-Cost Influence Network Model
Date
2012-09-01
Author
Dikmen Toker, İrem
Birgönül, Mustafa Talat
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
209
views
0
downloads
Cite This
The major challenges of project risk assessment may be attributed to the knowledge requirements for determining the level of uncertainty and the development of complex models to predict project outcomes. The duration-cost influence network is an adequate model that can be used for activity-based risk modeling. In this study, a scenario analysis feature is added to this model and a Web-based tool is developed that can be used to calculate risk-adjusted duration and cost, considering the risks affecting cost and duration of individual activities. Monte Carlo simulation is used to create scenarios, and the output of these scenarios is calculated by using the cost-duration influence system that simulates the vulnerability of the project to the identified risk factors. The Web-based tool can be used by decision makers during the preplanning stage of construction projects to estimate the cost and duration implications of various risk occurrence scenarios, determine contingencies, and prepare risk-management plans. DOI: 10.1061/(ASCE)CO.1943-7862.0000547. (C) 2012 American Society of Civil Engineers.
Subject Keywords
Strategy and Management
,
Industrial relations
,
Civil and Structural Engineering
,
Building and Construction
URI
https://hdl.handle.net/11511/41167
Journal
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
DOI
https://doi.org/10.1061/(asce)co.1943-7862.0000547
Collections
Department of Civil Engineering, Article
Suggestions
OpenMETU
Core
Fuzzy Structural Equation Model to Assess Construction Site Safety Performance
Gunduz, Murat; Birgönül, Mustafa Talat; Ozdemir, Mustafa (American Society of Civil Engineers (ASCE), 2017-04-01)
The main goal of this study is to examine the relationships between determinants of safety performance of construction sites. To achieve this goal, 168 observable variables and 16 latent dimensions that affect safety performance of construction sites were collected through extensive literature reviews, expert opinions, and face-to-face interviews. A questionnaire form was developed and administered to construction professionals as a data-collection tool about the observable variables and latent dimensions. ...
Context-Dependent Construction Conflict Management Performance Analysis Based on Competency Theory
Altuncan, Izel Unsal; Tanyer, Ali Murat (American Society of Civil Engineers (ASCE), 2018-12-01)
Construction project environments are shaped by uncertainty and complexity; therefore, conflict situations that lead to time and cost overruns are rather frequent. However, no empirical studies conducted so far have analyzed conflict management performances of individuals on a context-dependent basis. This paper proposes a performance assessment methodology for conflict management that integrates two different approaches from other disciplines: hypothetical situations and competency theory. The approach ana...
Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling
Eybpoosh, Matineh; Dikmen Toker, İrem; Birgönül, Mustafa Talat (American Society of Civil Engineers (ASCE), 2011-12-01)
The major aim of this research is to demonstrate that causal relationships exist among various risk factors that necessitate identification of risk paths, rather than individual risk factors, during risk assessment of construction projects. International construction projects have more complex risk-emergence patterns because they are affected by global and foreign country conditions and project-related factors. Identification of a network of interactive risk paths, each of which initiated from diverse vulne...
Exploring the Relationship between Complexity and Risk in Megaconstruction Projects
Erol, Huseyin; Dikmen, Irem; Atasoy Özcan, Güzide; Birgönül, Mustafa Talat (American Society of Civil Engineers (ASCE), 2020-12-01)
© 2020 American Society of Civil Engineers.Although complexity and risk are inherent characteristics of megaconstruction projects, existing project management approaches fail to incorporate complexity-based thinking into risk management. Complexity is usually considered as the source of risk events, along with uncertainty. However, prevailing risk management practices are oriented toward only handling the uncertainty. The lack of integration between the complexity and other risk-related concepts leads to un...
Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time-Cost Trade-Off Problem
Sönmez, Rifat; Uysal, Furkan (American Society of Civil Engineers (ASCE), 2016-03-01)
Despite the importance of project deadlines and resource constraints in construction scheduling, very little success has been achieved in solving the resource-constrained discrete time-cost trade-off problem (RCDTCTP), especially for large-scale projects. In this paper a new heuristic method is designed and developed to achieve fast and high-quality solutions for the large-scale RCDTCTP. The proposed method is based on the novel principles to enable effective exploration of the search space through adequate...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
İ. Dikmen Toker and M. T. Birgönül, “Web-Based Risk Assessment Tool Using Integrated Duration-Cost Influence Network Model,”
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
, pp. 1023–1034, 2012, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/41167.