Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Bayesian network based decision support for predicting and mitigating delay risk in TBM tunnel projects
Date
2021-09-01
Author
Koseoglu Balta, G.C.
Dikmen Toker, İrem
Birgönül, Mustafa Talat
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
260
views
0
downloads
Cite This
Tunnel projects involve high levels of uncertainty stemming from the vagueness of geological conditions and the complexity of the mechanized tunnel boring process. Delay risk assessment is carried out by project managers to identify critical risk factors leading to time and cost overruns and formulate strategies to meet the project targets under different scenarios. In this study, a Bayesian Belief Network (BBN) based risk assessment method was developed for Tunnel Boring Machine (TBM) tunnel projects to predict delay. Based on the BBN model, a decision-support tool, BBN Tunnel, was developed to assess delay considering the impacts of implementing alternative risk mitigation strategies. The tool developed in collaboration with a company was utilized in a tunnel project to test its usability in practice. The results demonstrated that BBN Tunnel and risk assessment method could be used to model interrelations between risk factors, construct a risk network, predict delay and help decision-makers formulate cost-effective risk mitigation strategies.
URI
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85109373883&origin=inward
https://hdl.handle.net/11511/91355
Journal
Automation in Construction
DOI
https://doi.org/10.1016/j.autcon.2021.103819
Collections
Department of Civil Engineering, Article
Suggestions
OpenMETU
Core
Seismic retrofitting of bridges by response modification techniques based on altering bearing fixities
Dicleli, Murat (Informa UK Limited, 2005-07-01)
Feasibility of a proposed seismic retrofitting technique for typical bridges in the Central US has been studied. The retrofitting technique is based on modifying the fixity conditions of the bearings for response modification purposes to eliminate the need for costly retrofitting of substructures. For this purpose, a seismically vulnerable bridge, typical of those in the Central US was selected. Detailed seismic analyses of the bridge were then conducted. It was found that its bearings, wing-walls and pier ...
Probabilistic Slope Stability Analyses: Effects of the Coefficient of Variation and the Cross-Correlation of Shear Strength Parameters
Oğuz, Emir Ahmet; Yalçın, Yağızer ; Huvaj Sarıhan, Nejan (2017-03-15)
The assessment of the safety level of natural slopes, road cuts, embankments and levees require consideration of uncertainties and variability in material properties. In this study, for a number of slope geometries, including a real-life landslide case, probability of failure (PF) and the most critical failure surface are investigated with and without cross-correlation of shear strength properties. Slopes having different traditionally-defined factor of safety (FS) levels are studied. The uncertainty of soi...
3D finite element modeling of surface excavation and loading over existing tunnels
Kaçar, Onur; Erol, Orhan; Department of Civil Engineering (2007)
The influence of the surface excavation and loading on the existing tunnels has been investigated using a Finite Element Method program, Plaxis 3D Tunnel. A parametric study has been carried out where the parameters were the depth of the surface excavation, the eccentricity of the excavation with respect to the tunnel axis, the height of the embankment fill and the stiffness of the soil. It is found that, excavations over the existing tunnels have a negative effect on the tunnel lining capacity since the un...
Multicomponent seismic loss estimation on the North Anatolian Fault Zone (Turkey)
Karim Zadeh Naghshineh, Shaghayegh; Askan Gündoğan, Ayşegül; Erberik, Murat Altuğ; Yakut, Ahmet (null; 2015-12-14)
Seismic loss estimation is essential to incorporate seismic risk of structures into an efficient decision-making framework. Evaluation of seismic damage of structures requires a multidisciplinary approach including earthquake source characterization, seismological prediction of earthquake-induced ground motions, prediction of structural responses exposed to ground shaking, and finally estimation of induced damage to structures. As the study region, Erzincan, a city on the eastern part of Turkey is selected ...
Computer-Aided Flow Analysis Through Culverts and Diversion Tunnels
Akçor, Buse Ecem; Yanmaz, Ali Melih; Department of Civil Engineering (2021-7-14)
Culverts and diversion tunnels are structures that can be exposed to many different hydraulic conditions throughout their lifetime. It is essential to know the flow behaviors that will occur in these conduits to size them and take the necessary precautions. In order to understand the characteristics of these conditions, a number of analyses should be made. In this study, all possible hydraulic situations that may occur throughout these conduits are examined by considering the tunnel structure as a long-span...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
G. C. Koseoglu Balta, İ. Dikmen Toker, and M. T. Birgönül, “Bayesian network based decision support for predicting and mitigating delay risk in TBM tunnel projects,”
Automation in Construction
, pp. 0–0, 2021, Accessed: 00, 2021. [Online]. Available: https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85109373883&origin=inward.