Scenario Building as Part of the Design Process

1997-06-01

Suggestions

Scenario Development: A Model-Driven Engineering Perspective
DURAK, Umut; TOPÇU, OKAN; SIEGFRIED, Robert; Oğuztüzün, Mehmet Halit S. (2014-08-30)
Scenario management practices in HLA based distributed simulation
Topçu, Okan; Oğuztüzün, Mehmet Halit S. (2010-04-01)
Training in a distributed simulation generally involves carefully designed and constructed simulation scenarios to fulfill the training aims. The simulation scenarios (i.e. federation scenario) play an important role in the federation design and development as specified in Federation Development and Execution Process. The simulation scenarios are used in every step in distributed simulation arena from the beginning (analysis and design) of a distributed simulation development to the execution. Such an exten...
Scenario-Based Tsunami Hazard Assessment For Java (Sunda) Trench Using Monte Carlo Simulations
Yavuz, Cüneyt; Kentel Erdoğan, Elçin (Şırnak Üniversitesi, 2019-07-01)
Java (Sunda) trench lying along the eastern and southern coasts of Indonesia is one of the world's most active seismic zone. Java (Sunda) trench experienced devastating earthquakes and tsunamis throughout history. Despite the fact that about 14 years have passed since the 2004 Indian Ocean earthquake and tsunami, the seismic activity in this region is still intense. Thus, reliable estimation of the associated hazard of a possible large earthquake that can generate tsunami is vital for designing early warnin...
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Tokdemir, Onur Behzat; Dikmen Toker, İrem (American Society of Civil Engineers (ASCE), 2019-02-01)
Although the line-of-balance (LOB) method is widely used for the scheduling of repetitive construction projects, there are only a limited number of studies that deal with the issue of how to incorporate uncertainty in repetitive schedules. In this paper, a delay risk assessment method is proposed for projects scheduled by LOB. In the proposed method, a LOB schedule is prepared considering the target rate of delivery, and then risk scenarios are defined considering the sources of uncertainty and vulnerabilit...
Uncertainty assessment of satellite- and model-based precipitation products over complex terrain of Turkey
Amjad, Muhammad; Yılmaz, Mustafa Tuğrul; Yücel, İsmail; Yılmaz, Koray Kamil (2019-04-07)
This study evaluates satellite-based (TMPA 3B42V7 and GPM IMERGv5) and model-based (ECMWF ERAInterim) precipitation products by using ground-based gauge stations as reference over Turkey, characterized by complex topography. Assessments of the products are performed over the nearest grids to the gauge stations (a total of 851) at daily, monthly and annual time scales. The accuracy assessments, categorical performance indices, and intensity-frequency related comparisons are performed over each station betwee...
Citation Formats
G. F. Hasdoğan, Scenario Building as Part of the Design Process. 1997.