Attenuation relationship for peak groundvelocity based on strong ground motion data recorded in Turkey

Download
2006
Altıntaş, Süleyman Serkan
Estimation of the ground motion parameters is extremely important for engineers to make the structures safer and more economical, so it is one of the main issues of Earthquake Engineering. Peak values of the ground motions obtained either from existing records or with the help of attenuation relationships, have been used as a useful parameter to estimate the effect of an earthquake on a specific location. Peak Ground Velocities (PGV) of a ground motion is used extensively in the recent years as a measure of intensity and as the primary source of energy-related analysis of structures. Consequently, PGV values are used to construct emergency response systems like Shake Maps or to determine the deformation demands of structures. Despite the importance of the earthquakes for Turkey, there is a lack of suitable attenuation relationships for velocity developed specifically for the country. The aim of this study is to address this deficiency by developing an attenuation relationship for the Peak Ground Velocities of the chosen database based on the strong ground motion records of Turkey. A database is processed with the established techniques and corrected database for the chosen ground motions is formed. Five different forms of equations that were used in the previous studies are selected to be used as models and by using nonlinear regression analysis, best fitted mathematical relation for attenuation is obtained. The result of this study can be used as an effective tool for seismic hazard assessment studies for Turkey. Besides, being a by-product of this study, a corrected database of strong ground motion recordings of Turkey may prone to be a valuable source for the future researchers.

Suggestions

Estimation of earthquake insurance premium rates based stochastic methods
Deniz, Aykut; Yücemen, Mehmet Semih; Department of Civil Engineering (2006)
In this thesis, stochastic methods are utilized to improve a familiar comprehensive probabilistic model to obtain realistic estimates of the earthquake insurance premium rates in different seismic zones of Turkey. The model integrates the information on future earthquake threat with the information on expected earthquake damage to buildings. The quantification of the future earthquake threat is achieved by making use of the seismic hazard analysis techniques. Due to the uncertainties involved, the hazard th...
GIS-based structural performance Assessment of Sakarya City after 1999 Kocaeli-Turkey earthquake from geotechnical and earthquake engineering point of view
Yılmaz, Zeynep; Çetin, Kemal Önder; Department of Civil Engineering (2004)
The August 17, 1999 Kocaeli-Turkey Earthquake (Mw=7.4) caused severe damage to the structures and lifelines in the Marmara region. Soil liquefaction was identified as one of the major causes of this damage. The aim of this study is to determine geotechnical and earthquake engineering factors that contribute to the structural damage observed in Sakarya city after 1999 Kocaeli Earthquake. For this purpose, the results of an extensive field investigation program compiled by General Directorate of Disaster Affa...
Schedule delay analysis in construction projects: a case study using time impact analysis method
Dayı, Songül; Elias Özkan, Soofia Tahira; Department of Architecture (2010)
Inadequate or weak preparatory work before starting construction of any structure may cause serious problems during the construction period. For example, projects without sufficient detailed drawings or construction schedules and a disorganized building site can create many problems in the management and completion of the construction works. Consequently, the cost of construction increases digressively, the construction duration of the project extends and the quality of construction is affected adversely. T...
Prediction of input energy spectrum: attenuation models and velocity spectrum scaling
Alici, F. S.; Sucuoğlu, Haluk (Wiley, 2016-10-25)
Recent improvements in performance-based earthquake engineering require realistic description of seismic demands and accurate estimation of supplied capacities in terms of both forces and deformations. Energy based approaches have a significant advantage in performance assessment because excitation and response durations, accordingly energy absorption and dissipation characteristics, are directly considered whereas force and displacement-based procedures are based only on the maximum response parameters. En...
Probabilistic seismic hazard analysis : a sensitivity study with respect to different models
Yılmaz Öztürk, Nazan; Yücemen, Mehmet Semih; Department of Civil Engineering (2008)
Due to the randomness inherent in the occurrence of earthquakes with respect to time, space and magnitude as well as other various sources of uncertainties, seismic hazard assessment should be carried out in a probabilistic manner. Basic steps of probabilistic seismic hazard analysis are the delineation of seismic sources, assessment of the earthquake occurrence characteristics for each seismic source, selection of the appropriate ground motion attenuation relationship and identification of the site charact...
Citation Formats
S. S. Altıntaş, “Attenuation relationship for peak groundvelocity based on strong ground motion data recorded in Turkey,” M.S. - Master of Science, Middle East Technical University, 2006.