Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Schedule delay analysis in construction projects: a case study using time impact analysis method
Download
index.pdf
Date
2010
Author
Dayı, Songül
Metadata
Show full item record
Item Usage Stats
1455
views
596
downloads
Cite This
Inadequate or weak preparatory work before starting construction of any structure may cause serious problems during the construction period. For example, projects without sufficient detailed drawings or construction schedules and a disorganized building site can create many problems in the management and completion of the construction works. Consequently, the cost of construction increases digressively, the construction duration of the project extends and the quality of construction is affected adversely. This study dwells on the importance of construction schedules in achieving the aim of producing good quality construction work within the specified duration. Monitoring continuously the interactive relation concerning delays in construction schedules and contractor demands is a complicated process. Here the simplest and basic approach is that, both for owner and contractor, time is money and for this reason construction schedule delays should be analyzed and corrective measures should be taken in a timely manner. The main purpose of this study is to investigate the causes of construction schedule delays and the methods of schedule delay analyses. In this context completion construction works of a covered swimming pool building in Ankara was selected as a case study for analyzing project scheduling and the delays therein. The “Time Impact Analysis Method” (TIA) was applied to the case study project using PRIMAVERA® software in order to determine the construction schedule delays; to measure the impacts of these delays on the project completion duration; and to allocate responsibility amongst the project participants for preventing delay claims. After the application of the delay analysis it was observed that the delays in the critical activities extended the project duration by 57 days in total i.e. by 15.4 % of the estimated construction period. Fines should have been paid by the contractor because of 31-days non-excusable delays. Also, the contractor should have been given a time extension of 26-days due to 22-days excusable compensable delays and 4-days excusable non-compensable delays which were beyond the control of the contractor. These delays were caused due to organizational deficiencies of the owner, the bureaucracy of the provincial municipality, the lack of detail drawings during the municipality application, the lack of experience of the contractor, problems in material procurement, unforeseeable weather conditions and shortages of qualified employees of the subcontractors. It was observed that of these all except one correspond to the important causes of delays as reported in literature concerning public projects in Turkey.
Subject Keywords
Engineering
URI
http://etd.lib.metu.edu.tr/upload/12612823/index.pdf
https://hdl.handle.net/11511/20224
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
Benefit-cost analysis for retrofitting of selected residental buildings in İstanbul
Erdurmuş, Salih Buğra; Erant, Engin; Department of Civil Engineering (2005)
During the evaluation of the seismic retrofitting option for risk reduction/mitigation measures to be applied over buildings, Benefit Cost Analysis is an often-used method. During this study of Benefit Cost Analysis, the condition that the earthquake can happen just after or sometime after retrofitting will be taken into consideration rather than some approaches that focus on the benefits and costs regarding the annual probability of the occurrence for possible earthquakes. The analysis will use conditional...
Developing a strategic information system for construction companies
Güneş, Tanyeli; Dikmen Toker, İrem; Department of Civil Engineering (2008)
Problems and issues at project level have been the main concern of the construction management studies and construction professionals. Consequently, the long-term strategic issues at corporate level remained uncovered in construction companies. The complex and unique characteristics of the industrial context of construction also limited the adoption of strategic management concepts by the companies. Recently, however, changing business environment, increasing competition in construction arena and higher cli...
Reliability-based risk assessment in coastal projects: Case study in Turkey
Balas, CE; Ergin, A (American Society of Civil Engineers (ASCE), 2002-03-01)
The risk of damage during the construction phase of a coastal structure was investigated by utilizing Level II and III reliability methods. Structural risks were incorporated in the planning phase of coastal projects by utilizing a practical risk management approach implemented in the Mezitli (Icel) Yacht Harbor project in Turkey. By specifying the exceedance probability of damage level at the design stage, the delay times of construction activities due to damage were obtained at the project-planning phase,...
Seismic vulnerability, behavior and design of tunnel form building structures
Balkaya, C; Kalkan, E (Elsevier BV, 2004-12-01)
Multi-story reinforced concrete tunnel form buildings are one of the common structural types in regions prone to high seismic risk due to the buildings inherent earthquake resistance and ease of construction. Despite their good performance during earthquakes in 1999 in Turkey, and abundance of such structures scattered worldwide, current seismic codes and design provisions provide insufficient guidelines for their seismic design. As a compensatory measure, a series of modal and nonlinear static analyses are...
Multidimensional Comparison of Lightweight Steel and Reinforced Concrete Structures: A Case Study
Celik, Tolga; Kamali, Saeed (Mechanical Engineering Faculty in Slavonski Brod, 2018-08-01)
Lightweight steel construction has some undeniable advantages over concrete construction; however, reinforced concrete structures are used ubiquitously in Mediterranean countries and therefore most of the scientific studies have been focused on the reinforced concrete structures. One of the main reasons for not using the lightweight steel construction widely is lack on knowhow about this method. This study is aimed at raising the knowledge about the technical features of cold-formed steel members as well as...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
S. Dayı, “Schedule delay analysis in construction projects: a case study using time impact analysis method,” M.Arch. - Master of Architecture, Middle East Technical University, 2010.